Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> -v <br /> C <br /> Q) <br /> VCU <br /> a � <br /> o <br /> CO O <br /> p�� o <br /> Q <br /> W rn <br /> Paved Shoulder--r I Q) 0 Q <br /> v <br /> CO <br /> v Q) <br /> O <br /> L <br /> T_ <br /> O <br /> 1 <br /> z' I <br /> 1 <br /> N <br /> V) 1 W <br /> O <br /> L <br /> T_ J 41 <br /> :3 <br /> O <br /> +� m <br /> ca <br /> E o <br /> TRENCH CUTTING POLICY Approved by: <br /> 4 V, CROSS CUTTING OF Aa"� <br /> 9LN% COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> Worldng for YOU Date:MAY 2015 Std. Dwg. No. R-36 <br />