My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502501 thru PS-1503000_ - PS-1502527
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1502501 thru PS-1503000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502501 thru PS-1503000_ - PS-1502527
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:40:15 PM
Creation date
12/31/2015 5:30:29 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1502527
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1502501 thru PS-1503000
Year2
2015
Address
CHRONICLE AV(WATERLOO RD TO HARDING WY)
Application
CALIFORNIA WATER SERVICES
Supplemental fields
APN
PS-1502527
Cross Ref
PWP730077
DocCategory
Permit Applications (PA)
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL PROVISIONS , <br /> Winter Weather Utility Work <br /> 1, SUPERVISION: The utility company(per.niittee) shall furnish fuli=time supervision of all work to insure <br /> compliance with the permit provision. <br /> 2, START OI'WORD: No work within the County.right-of-way shall be started until the utility company <br /> representative has made an evaluation of weather conditions and has determined the work can be <br /> accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEli NT: Dirt and mud shall riot be deposited'on the pavement outside the area of work, <br /> and if inadvertently tracked onto"the road travel way shall be removed immediately. <br /> 4. DAILY.'RESTORATION: Private driveways.anal road intersections shall be restored daily. <br /> 5. WEATHER-TIGHT CONDITIONS: AlLbt.en.ches shall be.filled and compacfed,ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to . <br /> any rain. <br /> F.TF-R NETS COUNTER\.-enera]provisionsWAnter Weather provisions.docx' <br />
The URL can be used to link to this page
Your browser does not support the video tag.