Laserfiche WebLink
SPECIAL, PROVISIONS . <br /> Winter Weather Utility Work <br /> 1. SUPERVISION.: The utility company(pern ittee) shall furnish full-time supervision of all work to insure <br /> compliance with the permit provision. <br /> 2. START OF WORK: No work within the County.right-of-way shall be started until the utility company <br /> representative has made an evaluation of weather conditions and has determined the work can be <br /> ` accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited-on the pavement outside the area of work, <br /> and if inadvertently tracked onto the road travel way shall be removed immediately. <br /> 4. DAILY RESTORATION: Private driveways.-and road intersections shall be restored daily. <br /> S. WEATHER-TIGHT CONDITIONS: All.trenches shall be.filled and compacted,.,ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to <br /> any rain. <br /> F:TERMITS COUNTMgeneral provisions\wnter Weather Provisions.docx <br />