Laserfiche WebLink
NOTES: <br /> 1 . If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> Q � <br /> O O <br /> O <br /> Paved Shoulder Q) 0 Q <br /> a4 <br /> o <br /> C: D <br /> W 6 U U <br /> 1 0— .� <br /> A <br /> O <br /> T� <br /> 4 <br /> O <br /> I 1 I <br /> 1 <br /> -F1 <br /> z I I I <br /> U; 1 W <br /> I I I <br /> V <br /> _T- J D <br /> C <br /> 4-0 <br /> O co <br /> E O <br /> I I I JU <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF Av'j� <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> Working for YOU Date: MAY 201-5]Std. Dwg. No. R-36 <br />