Laserfiche WebLink
NOTES- <br /> 1- <br /> OTES:1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> c <br /> a a; <br /> U�U <br /> p C <br /> � cU <br /> U) o <br /> �t o <br /> C:t <br /> � Q <br /> Paved Shoulder i U Q <br /> I I � 0 <br /> W O U U <br /> T <br /> o_ <br /> t <br /> CD_ <br /> i <br /> �I I <br /> Q)I ' <br /> Z' I <br /> a� I <br /> Ca_ <br /> w <br /> I <br /> _o <br /> J <br /> o U <br /> I +' U) <br /> � O <br /> 10 <br /> TRENCH CUTTING POLICY Approved by: <br /> CO OSS CUTTING OF <br /> UNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> wor>� for Y OU DEPARTMENT OF PUBLIC WORKS <br /> �"�Fa Date: MAY 2015 Std. Dwg. No. R-36 <br />