Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (D-2). <br /> U, U <br /> Q � <br /> � r U <br /> U O <br /> � p <br /> J <br /> v� <br /> Cr) Q <br /> Paved Shoulder —1 @ 0�_ <br /> a <br /> o <br /> 0 <br /> 0- ° Q u <br /> u a <br /> V <br /> C-)_ <br /> L <br /> o_ <br /> 41 <br /> i <br /> O <br /> o <br /> z o <br /> 0 <br /> w <br /> I <br /> V <br /> CD_ <br /> L <br /> J 41 <br /> CD 4-0 <br /> + O <br /> co <br /> u� <br /> 7/7 <br /> ON, <br /> E O <br /> i:i <br /> TRENCH CUTTING POLICY Approved by: <br /> Vv CROSS CUTTING OF <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF 'SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> Wadit,g for YOU Date: MAY 2015 Std. Dwg. No. R-36 <br />