Laserfiche WebLink
NOTES: <br /> 1 . If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (Q-2). <br /> 0 <br /> Q) <br /> U...i U <br /> O � <br /> 5 CU <br /> M O <br /> U3 <br /> Paved Shoulder <br /> x Q <br /> O II O <br /> Ow. <br /> O C U <br /> W N c- <br /> B <br /> O <br /> mz <br /> T� <br /> R <br /> O <br /> i <br /> 1 <br /> B <br /> O <br /> Z' 1 <br /> N <br /> U 1 W <br /> i I i <br /> O <br /> TL <br /> O � <br /> i O <br /> U) <br /> O <br /> I J U <br /> TRENCH CUTTING POLICY Approved by: <br /> CUTTING OF <br /> CROSS C <br /> No. Revision Description Date <br /> COUNTY ROADWAYS <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> WorMn$ far YOU Date: MAY 2015 Std. Dwg. No. R-36 <br />