My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502501 thru PS-1503000_ - PS-1502770
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1502501 thru PS-1503000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502501 thru PS-1503000_ - PS-1502770
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:41:24 PM
Creation date
12/31/2015 5:53:15 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1502770
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1502501 thru PS-1503000
Year2
2015
Address
W/S ESCALON-BELLOTA RD 1.6MI S/O HWY4
Application
PACIFIC GAS & ELECTRIC - SACRAMENTO
Supplemental fields
APN
PS-1502770
Cross Ref
PWP730052
DocCategory
Permit Applications (PA)
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
P? <br /> _JEo� NS <br /> 1_ This PeE-unit is issued under and subject to?-,,-I Laws and ordinances of agencies gove using he enc oach sent here n pe nL ped See the <br /> following references: <br /> STREETS AMID-1U HWAYS CODE <br /> 1.Division 1,Chapter3- <br /> 2.Division 2,Chapter 2,Section 942 <br /> 3--Division 2,Chapter 4,Section 1126 <br /> 4.Division 2,Chapter 5.5 and Chapter.6 <br /> S NT JOAQUIN COUNTY ORDINANCES NUMBERED:-324,441,648,662,-672;695,700,860,892,3359,and 3675. <br /> 2. It is understood and agreed by the Pennittee that the performance of any work under this permit shall constitute an acceptance of ami the <br /> P-, contained herein and failure on the Permiitee's part to comply with any provision will be c•use for revocation of this permit.Except as otherwise provided for public agencies gad franchise holders,this permit is revocable on five days 10-Cce. <br /> 3. All work shat be done subject a the supe.vision of and the satisfaction of the g aator. The Pernisee shaL-at all times during the pro-ens <br /> of the work keep the County Highway in as-neat and-clean condition as is possible and upon completion of the work au h -ized herein <br /> shall leave the County Highway in a thoroughly news,clean and usable condition <br /> 4. 'Ile Pczinitrtee also agrees by the acceptance of this permit to properly maintain any encroachment structure placed by the Pe•mitt,-on guy <br /> pa i of he County Isighway and to irmediately repair any damage to any portion of the highway,which occurs as a result of the <br /> mailrtenance of The said encroachment structure,until such time as he Peirmitiee may be relieved of the responsibilit far such maintenance <br /> by the County of San Joaquin <br /> 5. The Ptrmi—LLee also agrees by the acceptance of this permit to make,at its own expense,such repairs as may be deemed necessary by the <br /> Country Deparanent of Public Works. <br /> 6. It is further agreed by tic Permittee that whenever construction,reconstruction-or maintenance work upon the highway is necessary,the <br /> installation provided for herein shall,upon request of the County Department of Public''Works,be immediately moved or removed by and <br /> at the sole expense of the Permittee. <br /> 7_ No material used for h—B or backfill in the construction of the encroachment shall be borrowed or taken from within the Counts right of <br /> FTaY <br /> S. All work shall be planaed and carried out with as little inconvenience as possible to the traveling public.-No material shall be stacked <br /> within eight feet(T)"of the edge of the pavement or traveled way unless otherwise provided herein. Adequate provision shall be made for <br /> the protection of the traveling public_ Traffic control standards shall be utilized including barricades;approved signs and lights,and <br /> flagmen,as required by the particular work in progress. <br /> 9. The Permittee,by_the acceptance of this perm t,shall assume full responsibility for all liability for personal in or damage to property <br /> which may arise out of the work herein pcmaiued or which may arise out of the failure of the part of the Permittee to properly perform he <br /> work provided under this permit In the event any claim of such liability is made against the County of San Joaquin or any department, <br /> official or employee thereof the Permittee shall defend,indemnify,and hold each of them harmless for such claim- <br /> 11 <br /> laim10_ All backfill-material is to be moistened as necessary and thoroughly compacted with mechanical means.If required by the County Director <br /> of Public Works,such backfill shall consist of gravel or crushed rock The Permittee shall]maintain the su <br /> Lace over str uciu es placed <br /> hereunder as may be necessary to insure the return of the roadway to a compietely sable condition and until relieved of such responsibility <br /> by the County Department of Public Works.)Vherever a gavel_ crushed rock or asphalt surface is removed or damaged in the course of <br /> work reIated to the permitted encroachment,such material shall either be separately stored and replaced in the roadway as nearly as <br /> possible in its Original state or shall be replaced in kind,and the roadway shall be left in at least as good a condition as it mwas before the <br /> commencement of operations of placing the encroachment sructure_ <br /> 11. Whenever it becomes necessary to secure permission u om abutting property owners for the proposed work such authority must be secured <br /> by the Permittee prior to starting work <br /> 12. The current and future safety and convenience of the traveling public shall be given every consideration in the location and methods of <br /> construction utilized_ <br /> 13_ The Permittee is responsible for the preservation of survey monuments within the work herein permitted-?_any are disturb ed,the Pe_aisee <br /> is required to tie out each location and re-establish them after completion of work icing a licensed land surveyor.A corer record must be <br /> filed in accordance with state law for any re-set monuments. <br /> -�`��S CGuTT��=acct pro-rsioslGen�-zl Prov¢ions 2Cli.do.M1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.