Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation o-ccurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> C o <br /> 41 <br /> a> °�' <br /> U�U <br /> U � <br /> � cU <br /> O <br /> n <br /> Paved Shoulder�� iX <br /> Q <br /> v0 <br /> o <br /> 1= :3-C <br /> W O U <br /> 1 CL L.� <br /> T <br /> O <br /> F <br /> O <br /> 1 <br /> 41 <br /> Z I <br /> a) <br /> to I � <br /> 1 W <br /> i I i <br /> V <br /> O <br /> 41 <br /> O - 7 <br /> O <br /> C/) <br /> O <br /> 1 J U <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF Azl'j� <br /> COUNTY ROADWAYS No. Revision Description Date <br /> u► COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> WORYIIIg for YOU Date: MAY 2015 Std. Dwg. No. R-,76 <br />