Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> Q) <br /> t, <br /> U� U <br /> Q � <br /> O <br /> �s D <br /> co <br /> Paved Shoulder— i X Q <br /> N� O <br /> C: :3_C: <br /> O <br /> i <br /> 0 <br /> 41 <br /> 0 <br /> z <br /> UW <br /> o . <br /> L <br /> T 41 <br /> � D <br /> "—U <br /> O <br /> +1 U) <br /> it <br /> E O <br /> J U <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF <br /> COUNTY ROADWAYS No. Revision Description Date <br /> �► COUNTY OF SAN JOAQUIN <br /> Working for YOU DEPARTMENT OF PUBLIC WORKS <br /> Date: MAY 2015 Std. Dwg. No. R-36 <br />