My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502501 thru PS-1503000_ - PS-1502885
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1502501 thru PS-1503000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502501 thru PS-1503000_ - PS-1502885
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:42:40 PM
Creation date
12/31/2015 6:03:53 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1502885
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1502501 thru PS-1503000
Year2
2015
Address
W/S HENRY RD 195'N/O RIVER RD
Application
PACIFIC GAS & ELECTRIC - FRESNO
Supplemental fields
APN
PS-1502885
Cross Ref
PWP730052
DocCategory
Permit Applications (PA)
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SpECIAL PRO-VI-S <br /> NS . <br /> Winter Weather Utility Work <br /> > <br /> shall furnish full=time supervision of all work to insure <br /> The utility compa?y('Per.ml ee) <br /> I, �UpLH�y�I01@I: permit provision. <br /> compliance with the p <br /> No work within <br /> the County.right-of--way shall be started until the utility company <br /> 2. START OF�VOR�= evaluation of weather conditions and has determined the work can be <br /> representative has made an ev <br /> accomplished under the provisions of the permit- <br /> accomplished avement outside the area of work, <br /> CLEAN PA��NT: Dirt and mud shall not be ha°be removed immediately. <br /> 3' tracked onto the road travel way : . <br /> and if inadvertently <br /> 4. DAILY'RESTORATIOl�: <br /> Private driveways and road intersections shall be restored daily. <br /> All.trenches shall be,filled and compacfed,ditches and other <br /> the entire work area restored to weather-tight condition prior to . <br /> 5, �EATHEI�-TIGHT CONDITIONS: and <br /> en <br /> drainage facilities regarded and op <br /> any rain. <br />
The URL can be used to link to this page
Your browser does not support the video tag.