My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502501 thru PS-1503000_ - PS-1502903
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1502501 thru PS-1503000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1502501 thru PS-1503000_ - PS-1502903
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:43:02 PM
Creation date
12/31/2015 6:02:59 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1502903
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1502501 thru PS-1503000
Year2
2015
Address
W/S S NORTH RIPON RD S/O HWY 120
Application
PACIFIC GAS & ELECTRIC -FRESNO
Supplemental fields
APN
PS-1502903
Cross Ref
PWP730052
DocCategory
Permit Applications (PA)
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
See Note 1 Below <br /> Existing <br /> 6" Min 6"- rpavemen - I 1 -6}y <br /> (TYP)r i �a �� 6_ Min <br /> :� (I YP) <br /> 3, „ \� See Note 2 Below \\ \\ <br /> 0 \\ -Compact in 12" max N _ \� 3'-0" <br /> �\ layers to a min relative �\ N, <br /> �\ compaction of 95% ------ <br /> --_____ �� under pavement and \ -------- \ Var <br /> Var \\ _-- -_ \� 90% outside pavement <br /> \ <br /> OO � Compact in 24" max �_ � O \i OD 12" <br /> \� layers- to a min relative �\ O \\ L <br /> OD/2 �\ \\ compaction of 85%. <br /> \ i\ „Compact in 6 layers <br /> to a min relative <br /> compaction of 90%. <br /> 10" Min -=OD - - -10" Min 10" Min --OD 10" Min <br /> OD OD <br /> + 20" Min 20Min <br /> RIGID CONDUIT FLEXIBLE= CONQUIT <br /> NOTES: <br /> 1. New pavement shall be 1" thicker than existing pavement, minimum. <br /> of 0.25 - Ft. 'New base shall be 1" thicker than existing base, min of 0.50 Ft, <br /> 2. Select native material or imported gran-ular material as approved by the Director <br /> of Public Works. Backfill with materials equal to or better than the existing <br /> pavement and base in quality. <br /> 3. Relative compaction of materials shall be tested in accordance with <br /> the- State of California, Dept, of Transportation Testing Manuals, ,.test <br /> method No. California 216 or 231. <br /> 4. All existing pavement shall be. neatly cut to line prior to trench excavation. <br /> 5. Jetting or ponding will be permitted within the street right-of-way with <br /> a 3 year bond, when approved by the Director of Public Works. . <br /> 6. When shown by soil composition and compact ability, ninety percent (90%) <br /> compaction may be used, when approved by the Director of -Public Works. <br /> 7-. Special bedding and backfill requirements may be shown on the plans or <br /> specified in the speoial provisions. <br /> r. R5�,y g TRENCH <br /> � �p p.� BACKFILL Approved by: <br /> _ a - <br /> No. Revision Des <br /> cri tion Date <br /> . COUWTY OF SAN JOAQUEV <br /> DEPARTMENT OF PUBLIC WORKSVOTE for YOU <br /> Date: DEC.2014 Std. Dwg. No. R-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.