Laserfiche WebLink
l' <br /> NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> 0 U <br /> II 4.., <br /> r. Q) <br /> (D <br /> U� U <br /> II - <br /> Z3 �U <br /> CO O <br /> �� II <br /> C:.t <br /> Paved Shoulder--�� i x Q <br /> U U v- <br /> II O <br /> N� <br /> C �t <br /> W <br /> 1 <br /> V <br /> (D <br /> T <br /> O <br /> �I1 <br /> i I i <br /> NI 1 <br /> a-+ <br /> Z' 1 <br /> NI <br /> U) I D <br /> 1 W <br /> I t <br /> O <br /> L No <br /> T <br /> O J <br /> 4-(-) <br /> L O <br /> .t <br /> I E o <br /> %W <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF /a/lj� <br /> COUNTY ROADWAYS No. Revision Description Date <br /> e-k <br /> COUNTY OF SAN JOAQUIN <br /> Worldng for YOU DEPARTMENT OF PUBLIC WORKS <br /> Date: MAY 2015 Std. Dwg. No. R-36 <br />