Laserfiche WebLink
1 <br /> ` NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> o {, <br /> U�U <br /> Q - <br /> U) O <br /> � Q <br /> Paved Shoulder— I Q)Q <br /> 0 <br /> 0 <br /> CDS <br /> w QUO <br /> o_ <br /> C)_ <br /> L <br /> z. I <br /> I a. <br /> � w <br /> T_ <br /> 0 <br /> L <br /> +J <br /> o_ � D <br /> 7L o <br /> O <br /> VV1r <br /> TRENCH CUTTING POLICY Approved by: <br /> 11% CROSS CUTTING OF lalj� <br /> COUNTY ROADWAYS NoT Revision Description Date <br /> �-�► COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> wOi�ClIIg for YOU Date: MAY 2015 Std. Dwg. No. R-36 <br />