Laserfiche WebLink
r <br /> NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. if excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> o -1 <br /> O�U <br /> O � <br /> � cU <br /> V) O <br /> Paved Shoulder--�� i X Q)Q <br /> Q) U v_ <br /> O <br /> Q)'LO <br /> C: D� <br /> W a 0 U <br /> � I FL � C <br /> O <br /> O <br /> L <br /> I ' I <br /> �I � <br /> zI ' <br /> I I <br /> O <br /> O �41 <br /> � <br /> `+— co <br /> U <br /> i O <br /> E O <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> WUTYtIIg for YOU Date: MAY 2015 Std. Dwg. No. R-36 <br />