Laserfiche WebLink
1 . <br /> So� te <br /> IJ- <br /> 03 <br /> CIO <br /> i <br /> J' 232 Ii <br /> C <br /> �� 23 9 <br /> 233 <br /> N <br /> a <br /> pv e <br /> eree Y <br /> 0 FT 150 FT 300 FT <br /> Note: <br /> Distances in <br /> parenthesis measured out from <br /> property line <br /> Site D <br /> DeTCH <br /> Note: <br /> Paving requirements per SJC Roadway Design <br /> Standards Section 2-5.0 Trench Cut Policy <br /> Dig <br /> Locations <br /> Center Line <br /> (25')� <br /> 6" MinTYP Pavement Restored <br /> ( ) <br /> Gas Main 1' Thicker Than Existing <br /> J <br /> (14') Aggr -- J <br /> i <br /> Base Be ; <br /> Compacted in a W <br /> maximum of 12" layers <br /> to a relative compaction <br /> of 95X > ` <br /> under pavement _ <br /> and 90X outside ' <br /> pavement In accordance <br /> with SJC <br /> Property C4,)Sidewalk Standard �' ... <br /> Line Edge of R-29. <br /> Pavement � Gas <br /> (T) Main <br /> Face of <br /> Curb (5') <br /> 24" (TYP) <br /> i <br /> N <br /> 0 FT 20 FT 40 FT NOT TO SCALE <br /> EST: <br /> ADE: KEYHOLE — TEE CAP REPLACEMENT— <br /> co: <br /> SD: <br /> SANGUINETTI AVE STOCKTON, CA <br /> SUPV: KENNY CONOLLEY NOTIF.: I <br /> REP: OTHER: <br /> PLNR: SHT: 1 of 1 SHEETS <br /> SCALE: DATES 29 15 PACIFIC GAS AND ELECTRIC COMPANY PM' REV. <br /> 42448885 <br />