Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shill be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> Q) <br /> o 41 <br /> U�U <br /> co <br /> B � <br /> � cU <br /> � O <br /> Paved Shoulder—r►1 i X Q <br /> U 04- <br /> a o <br /> OJL <br /> U <br /> W a O U <br /> V <br /> O <br /> O <br /> 1 <br /> 41 <br /> N <br /> �i I a- <br /> I W <br /> V/ZZ/ V/7 <br /> i I i <br /> O <br /> O <br /> E O <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> Worldng for YOU Date: MAY 2015 Std. Dwg. No. R-36 <br />