My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503101
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1503001 thru PS-1503500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:43:59 PM
Creation date
12/31/2015 6:17:10 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1503101
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1503001 thru PS-1503500
Year2
2015
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC - STOCKTON
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
POLE INSTALLATION WITH ANCHOR
Owners
Parcel Address
E/S JOHNSON RD 2,620 S/O HWY 12
Primary Parcel
Type (2)
PS-1503101
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL PROVISION. . <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(perm*ittev) shall furnish fall'-time supervision of all work to insure <br /> compliance with the permit provision. <br /> 2. START OF WORK: No work within the'County.right-of-way shall be started until the utility company <br /> representative has made an evaluation of weather conditions and has determined the work can be <br /> accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited'on the pavement outside the area of work, <br /> and if inadvertently tracked onto the road travel way shall be removed immediately. <br /> 4. DAILY RESTORATION: Private driveways'arid road intersections shall be restored daily. <br /> 5. WEATHER-TIGHT CONDITIONS: . All trenches shall be.filled and compacted, ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to . <br /> any rain. <br /> F.TEPMITS COUNTER\general provisions\Winter Weather Provision Ldocx <br />
The URL can be used to link to this page
Your browser does not support the video tag.