Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cuts are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be resufaced as shown. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> c O <br /> Q) <br /> Q) <br /> C) U <br /> U � <br /> :3 �U <br /> O <br /> Paved Shoulder-- i X o Q <br /> O U v- <br /> Q <br /> N O <br /> W O O U <br /> Q)T � <br /> 4 <br /> O <br /> T� <br /> 4 <br /> O <br /> L _ <br /> i <br /> zl I <br /> co I <br /> i W <br /> 0 <br /> L <br /> oF J� <br /> � <br /> L o <br /> I o <br /> i <br /> IT - <br /> 0 TRENCH CUTTING POLICY Approved by: <br /> CROSS CUTTING OF Xa4ll� <br /> COUNTY ROADWAYS No. Revision Descri tion Date <br /> �'► COUNTY OF SAN JOAQUIN <br /> Worldng for YOU. DEPARTMENT OF PUBLIC WORKS <br /> Date: MAY 2015 Std. Dwg. No. R-36 <br />