Laserfiche WebLink
SPECIAL PROVISIONS , <br /> Winter Weather Utility Work <br /> 1. Si7PER. ISION: The utility company(per,Diittee) shall funvsh Dill:--time supervision of all work to insure <br /> compliance with the permit provision. <br /> 2. START OF WORK- No work within the County-right-of-way shall be started until the utility company <br /> evaluation of weather conditions and has determined the work can be <br /> representative has made an <br /> accomplished under the provisions of the permit. <br /> 3. CLEAN PA VEAWNT: Dirt and mud shall not be deposited*on the pavement outside the area of work, <br /> and if inadvertently tracked onto the road travel way shal>_be'removed immediately. <br /> 4. DAILY RESTORATION: Private driveways and road intersections shall be restored daily. <br /> 5. WEATHER-TIGHT CONDITIONS: All-Arenches shall be.filled and compacfed,ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to . <br /> any rain, <br /> F.-TERMITS COUNTER\general provisions\Winter Weather Provisions.docx' <br />