Laserfiche WebLink
SPECIAL PROVISIONS . <br /> Winter Weather Utility Work <br /> I. SUPERVISION: The utility company(per,uflttee) shall furnish fiali=time supervision of all work to insane <br /> compliance with the permit provision. <br /> 2. START OF WORD: No work within the County.right-of-way shall be started until the utility company <br /> evaluation of weather conditions and has determined the work can be <br /> representative has made an <br /> accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEM ENT: Dirt and mud shall not be deposited'on the pavement outside the area of work, <br /> and if inadvertently tracked onto the road travel way shah rri <br /> be removed immediately. <br /> 4. DAILY RESTORATION: Private driveways and toad intersections shall be restored daily. <br /> 5. ATHEI2-TIGHT CONDITIONS: All.trenches shall be.fitled and compacted, ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to . <br /> any rain. <br /> FAPERMITS COUNTER\genera]provisions\Winter Weather Provisions.docx <br />