Laserfiche WebLink
SPECIAL PROVISIONS <br /> Winter Weather Utility Work <br /> 1. SUPERVISION: The utility company(pea niittee) shall furnish fiwll=time' supervision of all work to insure <br /> compliance with the permit provision. <br /> 2. START OF WORK: No Work within the County.right-of-way shall be started until the utility company <br /> representative has made an evaluation of weather conditions and has determined the work can be <br /> accomplished under the provisions of the-permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited'on the pavement outside the area of work, <br /> and if inadvertently tracked onto-'the road travel way'shall be removed immediately. <br /> 4. DAILY RESTORATION: Private driveways and toad intersections shall be restored daily. <br /> 5. WEATHER-TIGHT CONDITIONS: All.trenches shall be.filled and compacfedy ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to . <br /> any rain. <br /> FAPF_RMITS COUNTER\general provisions\Winter Weathu Provisions.doc ' <br />