My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503375
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1503001 thru PS-1503500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:44:51 PM
Creation date
12/31/2015 6:25:47 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1503375
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1503001 thru PS-1503500
Year2
2015
Address
N/S ALPINE AV 200'E/O RAINER AV
Application
CALIFORNIA WATER SERVICE
Supplemental fields
APN
PS-1503375
Cross Ref
PWP730077
DocCategory
Permit Applications (PA)
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
California MUTCD 2014 Edition Page 1137 <br /> (P'HWA's MUTCD 2009 Edition,including Revisions 1 &2,as amended for use in California) <br /> Table 6H-4(CA).Taper Length Criteria for Temporary Traffic Control Zones <br /> (for 12 feet Offset Width) <br /> Minimum Taper Length" <br /> Speed" for Width of Offset 12 feet(W) <br /> S Merging Shifting Shoulder Down <br /> (mph) L U2 L/3 Stream <br /> (feet) (feet) (feet) (feetr <br /> 20 80 40 27 50 <br /> 25 125 63 42 50 <br /> 30 180 90 60 50 <br /> 35 245 123 82 50 <br /> 40 320 160 107 50 <br /> 45 540 270 180 50 <br /> 50 600 300 200 50 <br /> 55 660 330 220 50 <br /> 60 720 360 240 50 <br /> 65 780 390 260 50 <br /> 70 840 420 280 50 <br /> 75 900 450 300 50 <br /> -Posted speed limit,off-peak 85th-percentile speed prior to work starting,or the anticipated operating <br /> speed in mph. <br /> "-For other offsets use the following merging taper length formula for L: <br /> For speeds of 40 mph or less, L=WS2/60 <br /> For speeds of 45 mph or more,L=WS <br /> Where: L=taper length in feet <br /> W=width of offset in feet <br /> S=posted speed limit,off-peak 85th-percentile speed prior to work <br /> starting,or the anticipated operating speed in mph <br /> * -Maximum downstream taper length is 100 feet. See Section 6C.08. <br /> Chapter 6H—Typical Applications November 7,2014 <br /> Part 6—Temporary Traffic Control <br />
The URL can be used to link to this page
Your browser does not support the video tag.