My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503375
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1503001 thru PS-1503500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503375
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:44:51 PM
Creation date
12/31/2015 6:25:47 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1503375
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1503001 thru PS-1503500
Year2
2015
Address
N/S ALPINE AV 200'E/O RAINER AV
Application
CALIFORNIA WATER SERVICE
Supplemental fields
APN
PS-1503375
Cross Ref
PWP730077
DocCategory
Permit Applications (PA)
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br /> ENCROACHMENT PERMIT <br /> 12. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br /> 13. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br /> the roadway restored to two-way traffic. If plating is to be used, a trench shoring and plating plan <br /> suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br /> approval by the County. <br /> 14. The contractor shall use San Joaquin County Standard R-29 when backfilling trenches within the <br /> County right-of-way. Where the existing road structural section is below standard, a minimum <br /> section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be required. <br /> 15. Temporary pavement shall be provided for all trench areas within three days of pavement <br /> removal or by Friday of each week, whichever is more restrictive. <br /> 16. Final trench paving shall be placed when the length of temporarily surfaced trench exceeds 1,500 <br /> linear feet or by segment of road as determined by the County. Final trench paving will also be <br /> required to be placed when interruptions or delays of the work exceed two (2) weeks. <br /> 17. Roadway areas subject to pavement cuts shall receive a one (1) inch asphalt concrete overlay <br /> from the centerline (or lane line) to the edge of the travelled way. If the pavement is disturbed on <br /> both sides of the centerline (or adjacent lane), then the entire roadway (or affected lanes) shall be <br /> resurfaced. All pavement conforms shall be ground to provide a flush surface. Contractor shall <br /> grind and overlay within 10-working days of permanent trench paving. Shoulder areas shall be <br /> brought up to the finish grade as directed by the County. <br /> 18. No paving joints allowed within paved shoulder, contractor shall pave all the way to outer edge of <br /> paved shoulder. <br /> 19. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 20. Class II Aggregate Base shoulder backing is required from the edge of pavement, a minimum of <br /> 4-inches thick by 4-feet wide. <br /> 21. County roads shall be kept clean from mud and debris at all times along the access points and <br /> work zone areas during entire project. All standard roadway striping and signage shall be clearly <br /> visible, maintained and restored throughout the construction zone during and after the project. <br /> 22. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 23. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.