Laserfiche WebLink
California MU T CD 2014 Edition Page 11.17 <br /> (FHVVA's MUTCD 2009 Edition,including Revisions 1 &2,as amended for use in California) <br /> Table 6F-101(C , Maximurn Spacing of Channelizing Devices <br /> Speed Maximum Channelizing Devices Spacing <br /> acing <br /> Taper* Tangeni Conflict** <br /> — (feet) (feet) (feet) <br /> 70 20 40 10 —_ <br /> 255----� 25 50 12 <br /> 30 3060 15 <br /> 35 35 70 17 <br /> 40 40 � 80 20 <br /> 45 45 90 22 <br /> 50 50 100 25 <br /> 55 50 100 25 <br /> 60 50 100 25 <br /> 65 50 100 25 <br /> 70 50 100 25 <br /> 75 50 100 25 <br /> T Maximum channelizing device spacing for all speeds on one-lane/two-way tapers is <br /> 20 feet. <br /> Maximum channelizing device spacing for all speeds on downstream tapers is 20 <br /> feet. <br /> All other tapers are as shown. <br /> **Use on intermediate and short-term projects for taper and tangent sections where <br /> there are no pavement markings or where there is a conflict between existing <br /> pavement markings and channelizing devices. <br /> Chapter 6F—Temporary Traffic Control Zone Devices <br /> Part 6—Temporary Traffic Control November 7,2014 , <br />