Laserfiche WebLink
SPECIAL PROVISIONS , <br /> Winter Weather Utility Work <br /> 1. SUPERVISION.: The utility company(permittee) shall furnish full;-time supervision of all work to insure <br /> compliance with the permit provision. <br /> 2. STAURT OF WORJK: No work within the County.right-of-way shall be started until the utility company <br /> representative has made an evaluation of weather conditions and has determined the-work can be <br /> accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement outside the area of work, <br /> and if inadvertently tracked onto-'the road travel way.shall be removed immediately. <br /> 4. DAILY RESTORATION: Private dri-e' s.'and road intersections shall be restored daily. <br /> 5. WEATHER-TIGHT CONDITIONS: All trenches shall be.filled and compact ed,.ditches and other <br /> drainage facilities regarded and opened, and the entire work area restored to weather-tight condition prior to . <br /> any rain. <br /> FAMMITS COUNI'ER\Beneral provisionslwnter Weather Provisions.don <br />