My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503447
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1503001 thru PS-1503500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:45:05 PM
Creation date
12/31/2015 6:27:13 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1503447
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1503001 thru PS-1503500
Year2
2015
Address
S/W CORNER NEWTON RD/STEVENSON AV
Application
AT&T FRESNO
Supplemental fields
APN
PS-1503447
Cross Ref
PWP730079
DocCategory
Permit Applications (PA)
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
See Note 1 Below <br /> Eisting <br /> 67 -- L /6'fj � - �Pavemen� Min <br /> Typ)rT <br /> ( yp) <br /> \� See Note 2 Below \\ \\ <br /> 31- " <br /> \\ I � Compact in 12" max <br /> �\ layers to a. min relative <br /> compaction of 95% --=----- �-- <br /> �� _----_---_ \� under pavement and \ -------- \ Var <br /> Var \\ _-- —_ �� 90% outside pavement_. <br /> Compact .in 24" mar,\ OD 12" <br /> =� a e • p�1 y rs ra a min �_ela- uve �� \\ <br /> OD/2 �\ \\ compaction of 55%. <br /> Compact in 6" layers <br /> to a min relative <br /> compaction of 90%. <br /> 10" Min --Op _- __10" Min 10" Min - —0D —10" Min <br /> OD OD <br /> + 20" Min ; 20 Min <br /> RIGID CONDUIT TLEXIB!E CCNQUI T <br /> NOTES: <br /> 1. New pavement shall be 1" thicker than existing pavement, minimum. <br /> of 0.25 - R. 'New base shall be 1" thicker than existing base, min of 0.-50 Ft, <br /> 2. Select native material or imported gran-ular material as approved by the Director- <br /> of Public Works. Backfill with materials equal to or better than the existing <br /> pavement and base in quality. <br /> 3. Relative compaction of materials shall be tested in accordance with <br /> the- State of California, Dept. of Transportation Testing Manuals, :test <br /> method No. California 216 or 231. <br /> 4. All existing pavement shall be. neatly cut to line prior to trench excavation. <br /> 5. Jetting or ponding will be permitted within the street right—of—way 'with <br /> a 3 year bond, when approved by the Director of Public Works. <br /> 6. When shown by soil composition and compactability, ninety percent (90%) <br /> compaction may be used, when approved by the Director of 'Public Works. <br /> 7-. Special bedding and backfill requirements may be shown on* the plans or <br /> specified in the special provisions. <br /> WN Approved <br /> by: <br /> ¢ j -i No. Revision Description Dote <br /> COUNTY OF SAS JOA T 7�7--�T 1 <br /> L f = DEPARTMENT OF PUBLIC WORKS �U�� <br /> V fey= YOU <br /> Daie: DEC 201 Std. Dwg. No. ��,�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.