My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503468
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1503001 thru PS-1503500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503001 thru PS-1503500_ - PS-1503468
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:45:09 PM
Creation date
12/31/2015 6:27:50 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1503468
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1503001 thru PS-1503500
Year2
2015
Address
W/S ESCALON BELLOTA RD 1.6MI S/O HWY 4
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1503468
Cross Ref
PWP730052
DocCategory
Permit Applications (PA)
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
See Note 1 Below <br /> Existing I <br /> 6" Min 6„- �Pavemen -�I 4 -6' I�� <br /> (lyp). I 6” Min <br /> Ty 0) <br /> 1\ \� See Note 2 Below \\ <br /> \\ Compact in 12" max \ _ \ 3'-0" <br /> �� layers to a. min relative <br /> I_ ------ compaction of 95% _-----_ Var <br /> \\ --_---__ \� under pavement and \ - ----- <br /> Var 90% outside pavement.- <br /> op - Compact in 24" mar. \� 0D+12" . <br /> \� layers tol a min relative \ \ <br /> OD/2 �\ \\ compaction of 85%. \� <br /> Compact in 6" layers <br /> to a min relative <br /> compaction of 90%. <br /> 10" Min —01D - -10" Min 10" Min -OD -•-10" Min <br /> OD OD <br /> + 20" in 20 Min <br /> RIGID CONDUIT FLEXIBLE CONDO{'I <br /> NOTES: <br /> 1. New pavement shall be 1" thicker than existing pavement, minimum. <br /> of 0.25 • R. 'New- base shall be 1" thicker than existing base, min of 0:50 Ft, <br /> 2. Select native material or imported granular material as approved by the Director <br /> of Public Works. Backfill with materials equal to or better than the existing <br /> pavement and base in quality. <br /> 3. Relative compaction of materials shall be tested in accordance with <br /> the- State of California, Dept, of Transportation Testing Manuals, ,test <br /> method No. California 216 or 231. <br /> 4. All existing pavement shall be. neatly cut to line prior to trench excavation. <br /> 5. Jetting or ponding will be permitted within the street right-of-way 'with <br /> a 3 year bond, when approved by the Director of Public Works. <br /> 6. When shown by soil composition and compactability, ninety percent (90%) <br /> compaction may be used, when approved by the Director of Public Works. <br /> 7-. Special bedding and backfill requirements may be shown on' the plans or <br /> specified in the special provisions. <br /> Q - Approved by: <br /> gqIRCAL TRENCH BACKFILLS <br /> No. Revision Description Date <br /> COUNTY OF ,.S'AllT J®AQ ULV I I <br /> DEPARTMENT OF PUBLIC WORKS <br /> Date: DEC.2Q1�' S.W. Dwg. No. ©�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.