My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503501 thru PS-1504000_ - PS-1503510
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2015
>
PS-1503501 thru PS-1504000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2015_PS-1503501 thru PS-1504000_ - PS-1503510
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 4:45:14 PM
Creation date
12/31/2015 6:30:09 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1503510
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2015\PS-1503501 thru PS-1504000
Year2
2015
Address
W/S MACARTHUR DR6000'S/O LINNE RD
Application
PACIFIC GAS & ELECTRIC - SACRAMENTO
Supplemental fields
APN
PS-1503510
Cross Ref
PWP730052
DocCategory
Permit Applications (PA)
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
See Note 1 Below <br /> Existing <br /> 6" Min- 6"-- - PavemenI / i { _6" 59 <br /> (TYP), _ I �6_ Min <br /> 3' OF, See Note 2 Below <br /> Compact in 12" max \ _ \ 3'-0" <br /> layers to a. min relative \; <br /> compaction of 95% \ <br /> under pavement and \ -------- \ Var <br /> Var 90% outside pavement... ' <br /> 00 Compact in 24" max _ p . . \i OD , " <br /> \� layers to a min relative �\ O \� ' 12 <br /> OD/2 �\ \\ compaction of 85�. <br /> Compact in 6" layers <br /> LO a min relative <br /> compaction of 90%. <br /> 10" Min u-OD ---10" Min 10" Min -OD >, <br /> -~--10 M 11-1 <br /> OD OD <br /> + 20" Min <br /> 20 Min <br /> RIGID CONDUIT FLEXIBLEGONQUI <br /> NOTES: <br /> I. New pavement shall be 1" thicker than existing pavement, minimum. <br /> of 0.25 - R. *New base shall be 1" thicker than existing base, min of 0.50 R. <br /> 2. Select native material or imported gran-ular material as approved by the Director <br /> of Public Works-. Backfill with materials equal to or better than the existing <br /> pavement and base in quality. <br /> 3. Relative compaction of materials shall be tested in accordance with <br /> the- State of California, Dept. of Transportation Testing Manuals, :test <br /> method No. California 216 or 231. <br /> 4. All existing pavement shall be. neatly cut to line prior to trench excavation. <br /> 5. Jetting or ponding will be permitted within the street right—of-way with <br /> a 3 year bond, when approved by the Director of Public Works. <br /> 6. When shown by soil composition and compact ability, ninety percent (90%) <br /> compaction may be used, when approved by the Director of 'Public Works. <br /> 7-. Special bedding and backfill requirements may be shown on ' the plans or <br /> specified in the special provisions. <br /> � Approved by: <br /> T -CAL TRENCH BACKFILL <br /> YIP <br /> No. Revision Description Date <br /> 114, COUNTY OF SAN T®AQ U.� � <br /> w—oz fee YOU DEI'ARTMEIQT of PUBLIC WORKS <br /> Date: bEC.201 a, Std. Dwg. No. R-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.