Laserfiche WebLink
NOTES: <br /> 1. If the distance between cross—cute are less then 150' the entire area between <br /> corss—cuts shall be planed and resurfaced with one (1) inch of Asphalt Concrete. <br /> 2. The resurfacing requirements shall be in addition to County Standard Drawing No. <br /> R-29. <br /> 3. Resurfacing for Bell Holes shall meet these requirements. If excavation occurs within <br /> the shoulder or lane, only that area shall be: resufaced as shown,. <br /> 4. If cross—cutting is performed on Local Roads at intervals less then 150' a Seal <br /> Coat for that half of the roadway containing the trench can be used in lieu of <br /> resurfacing. Section 2-5.03 (B-2). <br /> r_ <br /> O � <br /> n iU <br /> U�U <br /> U � <br /> � cU <br /> o�J <br /> (J V) <br /> Paved Shoulder— � Q <br /> �� <br /> :� <br /> U U N <br /> 0 <br /> o_ <br /> i <br /> Q) <br /> e <br /> z' ' <br /> Q) I 0 <br /> i w <br /> o � <br /> `+-U <br /> o <br /> � m <br /> E o <br /> ' J U <br /> TRENCH CUTTING POLICY Approved by: <br /> CROSSCUTTING OF AVja�_ <br /> COUNTY ROADWAYS No. Revision Description Date <br /> COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC:WORKS <br /> `�ar�g for YOU Date:MAY 2015 Std. Dwg. No. R®36 <br />