Laserfiche WebLink
r` `1 <br /> • THOMAS R. FLINN P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> DIRECTOR STOCKTON,CALIFORNIA 85201-3018 <br /> •d.. .� (209)468-3000 FAX(209)468-2999 <br /> www.co.san-joaquin.ca.us <br /> THOMAS M.GAU <br /> DEPUTY DIRECTOR <br /> MANUEL SOLORIO Waddng for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGERJANES January 12, 2006 <br /> BUSINESS ADMINISTRATOR <br /> Pacific Gas and Electric Company <br /> Post Office Box 930 <br /> Stockton, California 95201 <br /> Attention: Curt Sousa <br /> SUBJECT: GIANONE PARK AREA STORM DRAINAGE PHASE 1-B <br /> Enclosed for your information is a set of preliminary plans for the Gianone Park Area Storm Drainage <br /> Phase 1-B. <br /> The project consists of placing storm drainage lines and resurfacing with asphalt concrete as shown on <br /> the plans. If your organization has any facilities (i.e. valves, maintenance holes, service enclosures, <br /> etc.)within the area, please plan to adjust your facilities before the project. <br /> Additionally, in the event you foresee any conflicts between your facilities and the proposed project, <br /> please notify the San Joaquin County Department of Public Works, by February 1, 2006. All utility <br /> relocations are to be completed by April 14, 2006. <br /> Construction is tentatively scheduled to begin in July 2006. If you have any questions regarding this <br /> project, please call'me at 468-3586. <br /> Sincerely, <br /> CHANG CAO <br /> Associate Civil Engineer Z. AM FLAe-9 11A <br /> CC:rc fHL D 1—L44A? <br /> DE-5LO40-R1 <br /> Enclosure: 5 sheets of plans 3 F6T tkaL-tuG oVCE. MAtkk AOC LArecALS <br /> WtLA- 15r-- <br /> c: <br /> 5rc: David Mendoza, Senior Civil Engineer ` <br /> David Wang, Associate Civil Engineer <br />