Laserfiche WebLink
�t.�..� COUNTY <br /> OF SAN JOAQUIN <br /> tto. "', <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810-1810 E. HAZELTON AVENUE Permit No: P - <br /> S 0901137 <br /> " CALIFORNIASTOCKTON, 95201 <br /> T Date Issued: 08/31/2009 <br /> -�- (209)468-3000 Exp. Date: 08/31/2010 <br /> FAX#(209)468-9324 <br /> Project No: PWP110005 <br /> APN No: 24717012 <br /> DRIVEWAY ENCROACHMENT PERMIT <br /> To: VALLEY PERMIT SERVICES <br /> 500 DISCOVERY BAY BLVD. <br /> DISCOVERY BAY, CA 94505 <br /> Location: 25962 E. CLOUGH AVE.; S/S OF CLOUGH AVE. 1/4 MILE E/O McHENRY AVE. <br /> In compliance with your request of 07/14/2009,and subject to all the terms,conditions and restrictions written below or printed as general <br /> or special provisions on any part of this form. <br /> Permission is hereby granted to construct One driveway w/o pipe shown on <br /> Permit Application No. PS-0901137 Quad: SE <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian <br /> and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the Permittee for the protection of the <br /> public in accordance with the current Caltrans Standard Specifications. <br /> A(n)(SEE STAMP) inside diameter per section 62 of the current Caltrans Standard Specifications,ALTERNATIVE;PIPE AND PIPE <br /> ARCH CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to clear <br /> toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s), from the edge of roadway <br /> right-of-way(front property) line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(4 inch) minimum of to <br /> compacted layer of three-quarter inch(3/4")maximum size aggregate base material(road gravel)conforming to Class 2 Aggregate Base <br /> specified in Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of Portland cement concrete. <br /> If portland cement concrete pavement is installed,expansion joints shall be provided at the edge of pavement and along property line. <br /> Surface grades of approach(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br /> The field Engineering Division of this office shall receive no less than forty-eight(48)hours notice prior to beginning of any work <br /> within the County right-of-way. After completion of the work permitted herein,all debris,lumber,barricades or any excess <br /> material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill ou <br /> completion provided by Grantor. t and mail notice of <br /> 611t no, tu. ."'� '0.4 i. ht;l�� Y°1 2 kS..Cfi_ <br /> THOMAS R. FLINN,Director <br /> Department Public Works <br /> r � <br /> D ,,,,` <br /> r(, #�i".t � <br /> FORMS: SS/WW R-17 if is dx a r! 1' l ;;� trk {'„ ts's Permit ction <br /> ')c the <br /> s' thc priqlerv., suzF i ,.t.s <br />