My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2009_EP-09-1801 thru EP-09-2000_ - EP-09-1954
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2009
>
EP-09-1801 thru EP-09-2000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2009_EP-09-1801 thru EP-09-2000_ - EP-09-1954
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:03:27 AM
Creation date
1/11/2016 3:46:15 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-09-1954
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2009\EP-09-1801 thru EP-09-2000
Year2
2009
Supplemental fields
Card Printed
False
Copy To
CrossRef
DocCategory
PublicWorks
DocNum
FileName
CITY OF MANTECA-PUBLIC WORKS
OrigTo
Project
TRENCH / DRIVEWAY APPROACH
Remarks
Reported
False
RptSupress
False
Summary
Title
E/S OF AUSTIN RD FROM LATHROP RD AND YOSEMITE RD
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL CONDITIONS FOR <br /> AUSTIN ROAD WATER PIPELINE <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. The contractor shall submit traffic control plans for all signing, detours, and <br /> any lane closure impacting County right-of-way. Traffic control plans shall be submitted two <br /> weeks prior to the closure date. <br /> 2. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 3. The driveway approach at the "Water Turn Out" area shall be to County Standard R-17. <br /> 4. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance of any impacts to their access. <br /> 5. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 6. No trench cutting of County roads shall occur between November 1 and March 31 without prior <br /> authorization by the County. <br /> 7. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications and shall <br /> not occur between November 1 and March 31 unless authorized by the County. <br /> 8. All pipe and pipeline-related facilities including, but not limited to, valves, utility boxes and vaults, <br /> and frames and covers shall be maintained by the City of Manteca. The City shall be responsible <br /> for any and all costs associated with the future relocation and/or adjustment of these facilities as <br /> determined by the County at the City's expense. (Streets and Highways Code 1463) <br /> 9. All future maintenance of the pipeline and related facilities within the County right-of-way will <br /> require a San Joaquin County Encroachment Permit, <br /> 10. Length of open, unbackfilled trench shall be limited to a total maximum length of 250 linear feet <br /> during working hours. <br /> 11. Trenches shall be maintained in a smooth and even condition to the satisfaction of the County <br /> throughout the project limits at all times. <br /> 12. All trenches shall be completely backfilled or shored and plated at the end of each workday, and <br /> the roadway restored to two-way traffic. If plating is to be used, a trench shoring and plating plan <br /> suitable for traffic loadings shall be prepared by a registered icivil engineer and submitted for prior <br /> approval by the County. <br />
The URL can be used to link to this page
Your browser does not support the video tag.