Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810-1810 E. HAZELTON AVENUE Permit No: PS-0901955 <br /> STOCKTON,CALIFORNIA 95201 Date Issued:09/08/2009 <br /> (209)468-3000 Exp. Date: 09/08/2010 <br /> FAX#(209)468-9324 <br /> Project No: PWPI10005 <br /> APN No: 00726034 <br /> DRIVEWAY ENCROACHMENT PERMIT <br /> To: NAVARRO,JULIO ETAL <br /> 24674 N GRAHAM RD <br /> ACAMPO CA 95220-9491 <br /> Location: 24674 N. GRAHAM RD.; E/S OF GRAHAM RD.2300 N/O JAHANT RD. <br /> In compliance with your request of 09/08/2009,and subject to all the terms,conditions and restrictions written below or printed as general <br /> or special provisions on any part of this form. <br /> Permission is hereby granted to construct Two driveway w/o pipe shown on <br /> Permit Application No. PS-0901955 Quad: NE <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard to pedestrian <br /> and/or vehicular traffic. Adequate lights,signs and barricades shall be placed and maintained by the Permittee for the protection of the <br /> public in accordance with the current Caltrans Standard Specifications. <br /> A(n)(SEE STAMP) inside diameter per section 62 of the current Caltrans Standard Specifications,ALTERNATIVE PIPE AND PIPE <br /> ARCH CULVERTS,shall be installed in roadside drainage ditch for drainage flow maintenance and shall be of sufficient length to clear <br /> toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s), from the edge of roadway pavement to <br /> right-of-way(front property) line shall be surfaced with a two inch(2")minimum of asphalt concrete over a(4 inch) minimum of <br /> compacted layer of three-quarter inch(3/4")maximum size aggregate base material(road gravel)conforming to Class 2 Aggregate Base <br /> specified in Section 26 of the current Caltrans Standard Specification,or with a four inch(4")minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed,expansion joints shall be provided at the edge of pavement and along property line. <br /> Surface grades of approach(es)and/or to open ends of pipe. No ponding or puddles on pavement surface shall be allowed. <br /> The field Engineering Division of this office shall receive no less than forty-eight(48)hours notice prior to beginning of any work <br /> within the County right-of-way. After completion of the work permitted herein,all debris,lumber,barricades or any excess <br /> material shall be removed and the jobsite left in a neat workmanlike condition. The Permittee shall fill out and mail notice of <br /> completion provided by Grantor. <br /> to occupaney f)f t:hc resider cv. <br /> THOMAS R. FLINN,Director <br /> Departure of Public Works <br /> ttl�w ttia t Pe it section <br /> FORMS: SS/WW,R-17 det,;rinirle the drre will be <br /> L iuired at this <br /> iii' refthe pr(�pert.a, (� ner (r) sim!'fy <br /> / r�eedesi <br />