Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> DEPARTMENT OF PUBLIC WORKS <br /> c < <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE Date IssuedP09/25/2009 <br /> STOCKTON,CALIFORNIA 95201 <br /> Exp. Date: 10/15/2009 <br /> (209)468-3000 <br /> Project No: PWP110005 <br /> FAX#(209)468-9324 <br /> Quad: SE <br /> ENCROACHMENT PERMIT <br /> To: ROSS F.CARROLL,INC. <br /> 8873 WARNERVILLE RD. <br /> OAKDALE,CA 95361 <br /> Encroachment Type__ <br /> Traffic Control Devices <br /> Location: <br /> ARTHUR RD. W/O ESCALON CITY LIMITS <br /> In compliance with your request of09/25/2009,permission is hereby granted to do work in County right-of-way as shown on attached <br /> and restrictions written below or printed as general or special provisions on any part of <br /> application and subject to all the terms,conditions <br /> this form. See reverse side and attached sheet, y <br /> Trench excavations for service connections will not be permitted within ten feet V10')of ith that of avement centerline <br /> e abutting lsurfac less otherwise <br /> approved <br /> ved by <br /> the Director. Surface of trench patches shall match in kind and be smooth and e <br /> e area in aicipaion of future drainage <br /> be given to depth of utilities througtto beseroadist bushed and accturately dimensioned on sketches from surveyed centerl.. facilities,road rofile and/or ine of rroadlright of <br /> All underground utility facilities are <br /> way,or from right of way(border)lines. <br /> The Department of Public Works, Field Inspection Section shall receive a notice at least forty-eight hours prior to beginning any work <br /> within the County right of way. All work performed under this permit shall conform to the rules and regulations pertaining to safety <br /> established by the California Division of Industrial Safety and Cal-OSHA. <br /> The jobsite shall be kept in a safe condition at all times by the daily removal of any excess dirt or debris which might be a hazard to either <br /> pedestrian or automobile traffic. All necessary traffic convenience and warning devices and personnel shall be provided,placed and <br /> maintained by and at the sole expense of the Permittee in accordance with the latest edition of the CALTRANS Manual of Traffic Control. <br /> After completion of the work permitted herein,all debris,lumber,barricades,or any excess material shall be removed and the jobsite left <br /> in a neat workmanlike manner. Immediately following completion of construction permitted herein,Permittee shall fill out and mail notice <br /> of completion provided by Grantor. <br /> S ecial Comments: <br /> Traffic Control Per MUTCD <br /> FORMS: ----� <br /> Est.Permit Fee: 5150.00 THOMAS R. FLINN, Director <br /> De artment of Public Works <br /> WHITE -Permitec <br /> GOLDENROD -PWD Central File -- <br /> YELLOW -Field Inspection $y. <br /> P it Section <br /> PINK -Permit Section <br />