My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2009_EP-09-2001 thru EP-09-2300_ - EP-09-2267
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2009
>
EP-09-2001 thru EP-09-2300
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2009_EP-09-2001 thru EP-09-2300_ - EP-09-2267
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:04:20 AM
Creation date
1/11/2016 3:53:49 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-09-2267
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2009\EP-09-2001 thru EP-09-2300
Year2
2009
Supplemental fields
Card Printed
False
Copy To
CrossRef
DocCategory
PublicWorks
DocNum
FileName
CITY OF STOCKTON
OrigTo
Project
TRAFFIC CONTROL DEVICES FOR GROUND BREAKING CEREMO
Remarks
Reported
False
RptSupress
False
Summary
Title
W/S OF LOWER SACRAMENTO RD 1/2 MILE N/O EIGHT MILE RD
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Stockton—Delta Water Supply Project <br /> WTP Construction Entrance/Ground Breaking Ceremony <br /> Description of Work <br /> Thifollowing describes the steps to be taken through the duration of the construction project:/ <br /> • site control measures will be established starting approximately October 12, 9 and will <br /> rem in effect until the project is substantially completed, which is currentl cheduled for <br /> Februar 9, 2012. <br /> ■ Prior to the tart of construction CDM will widen the existin <br /> g site acces riveway to allow <br /> better access. his will include extending the existing culvert and a 'ncreasing the entrance pull <br /> off and turn radiu o allow for easier entrance off Lower Sacram to Road. <br /> • All Construction tra will utilize this entrance to the site incl ing all deliveries and employees. <br /> ■ In accordance with the a roved SWPPP CDM will lime tre and rock the access drive prior to <br /> the start of work to help mi ' ize tracking of mud onto a paved road. All construction work <br /> and lay down areas are locate&WEll back from the p ed road. CDM will have the paved <br /> roadway swept on an as needed b is should mu a tracked offsite. <br /> ■ In accordance with the project dust co�trol pla , CDM will periodically water the entrance road <br /> and lay down areas to control dust. <br /> • When possible incoming delivery drivers ill directed to the site in a manner that will bring <br /> them in via the southbound lane allow" g them turn right into the site. <br /> • Upon completion of their offloadin ctivities delive drivers will be advised of the site "Right <br /> turn only" policy for their exit. ign will also be poste at the intersection indicating "No Left <br /> Turn". <br /> • Temporary Haul Routes wi e established for concrete tru kd s ndump trucks such that <br /> vehicles will approach v' the southbound lane for a right turn int the site,and will leave the <br /> site via a right turn. <br /> • Mandatory Site S ty orientation to be taken by all site workers will inc e education of the <br /> sites "Right tur only" requirements. <br /> • Upon compI ion of the project, the temporary construction entrance apron an culvert will be <br /> removed h .. removing the appearance of this access to the property. <br /> ■ See E ibit A for more details. <br /> In addition to the above, the following additional controls will be employed for the Ground Breaking <br /> Ceremony from 10:00 to about 12:00 on October 29th, 2009: <br /> • In addition to the above stated controls, a flagger and warning signage will be provided on <br /> Lower Sacramento Road the morning of the ceremony as indicated in Exhibit B. This flagger will <br /> allow southbound traffic to be stopped to clear any back up created by northbound vehicles <br /> turning left into the site. <br /> • A flagger will be provided at the site exit to direct vehicles leaving the site that they must turn <br /> right. <br />
The URL can be used to link to this page
Your browser does not support the video tag.