My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2009_EP-09-2701 thru EP-09-2900_ - EP-09-2721 (2)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2009
>
EP-09-2701 thru EP-09-2900
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2009_EP-09-2701 thru EP-09-2900_ - EP-09-2721 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:06:10 AM
Creation date
1/11/2016 4:06:07 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-09-2721 (2)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2009\EP-09-2701 thru EP-09-2900
Year2
2009
Supplemental fields
Card Printed
False
Copy To
CrossRef
DocCategory
PublicWorks
DocNum
FileName
VALENTINE CORPORATION
OrigTo
Project
TEMP. ROAD CLOSURE
Remarks
Reported
False
RptSupress
False
Summary
Title
HANSEN RD 1/2 MILE S/O VON SOSTEN RD (I-205 AT HANSEN RD OVERCROSSING)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
California MUTCD Page 6H-5 <br /> (FHWA's MUTCD 2003 Revision 1,as amended for use in California) <br /> �--� Table 6H-3. Meaning of Letter Codes on <br /> Typical Application Diagrams <br /> Road Type Distance Between Signs" <br /> A B C <br /> Urban (low speed)" 30 (100) 30 (100) 30 (100) <br /> Urban (high speed)* 100 (350) 100 (350) 100 (350) <br /> Rural 150 (500) 150 (500) 150 (500) <br /> Expressway/ Freeway 300 (1,000) 450 (1,500) 800 (2,640) <br /> * Speed category to be determined by highway agency <br /> ** Distances are shown in meters (feet).The column headings A. B, and C are the dimensions <br /> shown in Figures 6H-1 through 6H-46.The A dimension is the distance from the transition or <br /> point of restriction to the first sign.The B dimension is the distance between the first and second <br /> signs.The C dimension is the distance between the second and third signs. (The third sign is the <br /> first one in a three-sign series encountered by a driver approaching a TTC zone.) <br /> Table 6H-4. Formulas for Determining Taper Lengths <br /> Speed Limit (S) <br /> Taper Length (L) Speed Limit (S) Taper Length (L) <br /> Meters Feet <br /> 60 km/h or less L = WS2 40 mph or less L = WS2 <br /> 155 60 <br /> 70 km/h or more L = WS 45 mph or more L =WS <br /> 1.6 <br /> Where: L = taper length in meters (feet) <br /> W =width of offset in meters (feet) <br /> S posted speed limit, or off-peak 85th-percentile speed prior to work starting, or the <br /> anticipated operating speed in km/h (mph) <br /> (7his space left intentionally blank) <br /> Chapter 6H—Typical Applications September 26,2006 <br /> Part 6—Temporary Traffic Control <br />
The URL can be used to link to this page
Your browser does not support the video tag.