My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2009_EP-09-2701 thru EP-09-2900_ - EP-09-2748
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2009
>
EP-09-2701 thru EP-09-2900
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2009_EP-09-2701 thru EP-09-2900_ - EP-09-2748
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:06:19 AM
Creation date
1/11/2016 4:07:06 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-09-2748
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2009\EP-09-2701 thru EP-09-2900
Year2
2009
Supplemental fields
Card Printed
False
Copy To
CrossRef
DocCategory
PublicWorks
DocNum
FileName
CALIFORNIA WATER SERVICE
OrigTo
Project
BELL HOLE
Remarks
Reported
False
RptSupress
False
Summary
Title
E/S OF SUNSET AVE 10' N/O TOTTEN AVE
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIAL CONDITIONS FOR DELTA WATER SUPPLY TREATMENT <br /> PLANT CONSTRUCTION ENTRANCE ENCROACHMENT PERMIT <br /> 1. All traffic control plans shall adhere to the Manual on Uniform Traffic Control Devices (MUTCD). <br /> 2. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours. During working hours, two-way <br /> traffic control shall be maintained with one lane open and appropriate flaggers with two-way <br /> radios. The contractor shall submit traffic control plans for all signing, detours, and any lane <br /> closure impacting County right-of-way. <br /> 3. Lane closures and flagging within County jurisdiction shall be limited to work hours between 9:00 <br /> am and 3:00 pm. <br /> 4. Residents and Bear Creek Community Church shall be notified in writing of any impacts to their <br /> access. Provide a copy of the notification to San Joaquin County Public Works. <br /> 5. Final paving shall be per Caltrans' specifications and shall not occur between November 1 and <br /> March 31 unless authorized by the County. <br /> 6. All future maintenance of the construction driveway, including pavement repair and striping, within <br /> the County right-of-way will require a San Joaquin County Encroachment Permit. <br /> 7. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 8. School buses shall be passed through the work zone with minimal delay. <br /> 9. The roadway shall be restored to its pre-construction condition when the construction entrance is <br /> no longer needed; including restoration of the pavement, shoulder and drainage ditch with the <br /> following exception: The existing driveway is not permitted to remain as site access after <br /> construction and shall not be re-constructed to pre-existing conditions. <br /> 10. It is the responsibility of the applicant to ensure existing drainage channels/ditches convey <br /> drainage during and after construction. <br /> 11. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br /> 12. County roads shall be kept clean from mud and debris at all times during entire project. All <br /> standard roadway striping and signage shall be clearly visible, maintained and restored <br /> throughout the construction zone during and after the project. <br /> 13. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br /> free of dirt, mud and debris during construction activities. The contractor shall provide daily, or as <br /> needed, street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 14. Storage of construction material and equipment within the County right-of-way is not allowed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.