My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RECORD OF SURVEY 35-004
PublicWorks
>
VAULT MAPS
>
Record of Survey
>
VOL 35 001-100
>
RECORD OF SURVEY 35-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2016 12:41:07 PM
Creation date
1/7/2016 5:26:32 PM
Metadata
Fields
Template:
Record of Survey
Supplemental fields
DocCategory
Record of Survey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DIST COUNTY ROUTE KILOMETER POST SHEET TOTAL <br /> - POST MILES NO. SHEETS <br /> 22. 7/38. 1 <br /> NETWORK TIES TO HPGN 10 s1 99 14. 1 /23. 7 2 5 <br /> " <br /> tric t <br /> 0A <br /> THE NETWORK SHOWN ON THIS SHEET WAS ORIGINALLY OBSERVED BY GPS STATIC SURVEY METHODS IN <br /> MARCH 1990 AND NAD83 COORDINATES WERE ESTABLISHED ON THE PROJECT CONTROL SURVEY MONUMENTS. <br /> IN NOVEMBER 1994, THE COORDINATE VALUES OF THE PROJECT CONTROL SURVEY MONUMENTS WERE <br /> HAMMER Lf� <br /> UPGRADED TO NAD83-92 USING UPDATED, BUT STILL PRELIMINARY, COORDINATE VALUES FOR THE HPGN <br /> DENSIFICATION SURVEY CONTROL MONUMENTS. FINAL ADJUSTMENT PER GEOLAB LEAST SQUARES, <br /> VERSION 1 . 9. (SEE CALTRANS DISTRICT 10 SURVEYS FIELD BOOK NOS. 4003 AND 93- 169) . <br /> HPGN-D IOKG Al <br /> (STOCKTON SW BASE) PROJECT CONTROL ESTABLISHED IN THIS NETWORK WAS HELD FIXED IN THE TRAVERSE SHOWN ON SHEET 1 . <br /> Cn <br /> SCALE 1. 100,000 ro <br /> STOCKTON HPGN-D IOKH <br /> (ELM) <br /> ST AT RIE <br /> . SJ-99 PM 17. 38 <br /> • SJ-99 PM 17. 15 <br /> 0 <br /> cr- <br /> w <br /> z <br /> 0 <br /> F- <br /> N1 Q <br /> fn <br /> �o <br /> PDX <br /> RON RD /'oO <br /> s <br /> •up SJ-99 PM 14. 34 <br /> • SJ-99 I'M 14.09 <br /> ui <br /> o') HPGN-D IOJH <br /> ui z <br /> 4 (DAVIS)VIS) <br /> M <br /> o a0 <br /> U, <br /> F— <br /> N <br /> a. <br /> cr <br /> STATE OF CALIFORNIA <br /> BUSINESS AND TRANSPORTATION AGENCY <br /> DEPARTMENT OF TRANSPORTATION <br /> DISTRICT 109 STOCKTON <br /> RECORD OF SURVEY <br /> LEGEND ROUTE 99 HORIZONTAL PROJECT CONTROL <br /> SITUATED IN FOLLOWING SECTIONS : <br /> A (HPGN DENSIFICATION CONTROL SURVEY MONUMENT <br /> - HELD FIXED THIS ADJUSTMENT T . I N . R . 7 E . M. D . M p , 2 8 , 33p <br /> 0 PROJECT CONTROL SURVEY MONUMENT T . 2 N . R . 6 E . M. D . M. p 1 2p 13 , <br /> - GPS MEASURED BASELINE C . M. WEBER GRANT , 49 , 51 thru 60 <br /> SAN JOAQUIN COUNTY , CALIFORNIA <br />
The URL can be used to link to this page
Your browser does not support the video tag.