Laserfiche WebLink
woo <br /> SURVEYOR'S STATEMENT: SURVEY TABLE OF CONTENTS <br /> THIS MAP CORRECTLY REPRESENTS A SURVEY MADE BY ME OR UNDER MY RECORD 0F <br /> DIRECTION IN CONFORMANCE WITH THE REQUIREMENTS OF THE LAND <br /> SURVEYORS' ACT AT THE REQUEST OF THE CITY OF STOCKTON IN !ITEM _ SHEET NUMBER <br /> NOVEMBER, 2000. OF THE (SURVEY NOTES _ -_ _ 2 <br /> CITY OF STOCKTON HORIZONTAL CONTROL SYSTEM PHASE XIV (DATUMS & REFERENCES 2 <br /> DATED THIS __17 _____ DAY OF _ © V� 2001. WITHIN THE CITY OF STOCKTON AND COUNTY OF SAN JOAQUIN, (DATUM RELATIONSHIPS 2 <br /> _ . _ <br /> ��,• �i� � STATE OF CALIFORNIA (EQUIPMENT, DATA COLLECTION & POST PROCESSING 2 <br /> i OF DATA _ <br /> -- -- <br /> 4€, � LYING WITHIN THE FOLLOWING SECTIONS, i NETWORK _ ? <br /> ti , ,, MOUNT DIABLO BASE AND MERIDIAN AND C.M. WEBER GRANT: FIELD SURVEYS ­11 2 <br /> MICHAEL R. MCGEE, P.L.S. NO 3945 n�. w .. -w -111. <br /> ____ <br /> LICENSE EXPIRATION DATE: ADJUSTMENTS 2 <br /> TOWNSHIP RANGE SECTION 3 <br /> ADJUSTMENTS (CONTINUED) <br /> 1 NORTH 6 EAST 4, 5, 8, 9, 15, 16, 17, 21, 22, 27, 28, 32, 33, 34 <br /> SURVEYOR'S STATEMENT: AccuRacY -- 3 <br /> 2 NORTH 5 EAST 1 _ - <br /> THIS MAP CORRECTLY REPRESENTS A SURVEY MADE BY ME OR UNDER MY 2 NORTH 6 EAST 1 THRU 23, 31, 32 'PRIMARY NETWORK MAP 4 <br /> SECONDARY NETWORK MAP NORTH _ 5 <br /> DIRECTION IN CONFORMANCE WITH THE REQUIREMENTS OF THE LAND 3 NORTH 6 EAST 31 THRU 36 I <br /> SURVEYORS' ACT AT THE REQUEST OF THE CITY OF STOCKTON IN SECONDARY NETWORK MAP CENTRAL 6 <br /> NOVEMBER, 2000. (SECONDARY NETWORK MAP SOUTH 7 _ <br /> C.M. WEBER GRANT: �_,SCALE_ <br /> CON TROL POINT COORDINATES, DESCRIPTIONS & 8 to 14 <br /> I 3 ±� DAY OF /V'OV644 6I �__, 2001. A THRU D, 4 THRU 14, 16 THRU 38, 40 THRU 42, 44 THRU 50, 53, 54, 56, FACTORS <br /> DATED THIS __ ________, ___ <br /> 58 THRU 60, 64 THRU 66, 68, 69, 75, 76, 79 & 80 _ _ _ _ _ _- - __- <br /> ROBERT E. CHESNER, P.L.S. NO 6670 .� GENERAL SURVEY NOTES <br /> LICENSE EXPIRATION DATE: �►/ °/°'_`f j �� P- PROJECT PREPARED BY: <br /> 613o1a� McGEE SURVEYING CONSULTING PROJECT OVERVIEW: <br /> L.S. 6670 SANTA BARBARA, CALIFORNIA THE CITY OF STOCKTON PERFORMED A FIRST ORDER CONTROL SURVEY IN DECEMBER 2000 <br /> FOR THE PURPOSE OF DENSIFYING THE 1994 CITY OF STOCKTON GPS CONTROL NETWORK <br /> SURVEYOR'S STATEMENT: Vii= AND (1994 COSCN). THIS SURVEY UTILIZED THE GLOBAL POSITIONING SYSTEM (GPS) FOR THE <br /> THIS MAP CORRECTLY REPRESENTS A SURVEY MADE BY ME OR UNDER MY K J E LD S E N , SINN 0 C K & N E U D E C K, INC. PURPOSE OF DETERMINING THE POSITIONS OF 188 POINTS BASED ON THE NORTH AMERICAN <br /> DIRECTION IN CONFORMANCE WITH THE REQUIREMENTS OF THE LAND CONSULTING ENGINEERS & LAND SURVEYORS DATUM OF 1983 (NAD 83} AND THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVA 88). <br /> SURVEYORS' ACT AT THE REQUEST OF THE CITY OF STOCKTON IN THIS SURVEY EXTENDS THE 1994 COSCN TO INCLUDE NEW MONUMENTS AND EXISTING <br /> STOCKTON, CALIFORNIA CONTROL MONUMENTS PREVIOUSLY BASED ON CONVENTIONAL SURVEY MEASUREMENTS. THE <br /> NOVEMBER, 2000. MARCH, 2001 FIELD CAMPAIGN WAS PLANNED, COORDINATED AND EXECUTED BY ROBERT CHESNER, PLS <br /> (� TN 6670, CITY OF STOCKTON SURVEYOR AND DARREL RAMUS, PLS 7192, SURVEY MANAGER FOR <br /> DATED THIS ____________ DAY OF _N�VE/!� � _, 2001. KJELDSEN, SINNOCK & NEUDECK, INC., IN A SHARED RESPONSIBILITY WITH MICHAEL MCGEE, <br /> PLS 3945, OF MCGEE SURVEYING CONSULTING OF SANTA BARBARA, CALIFORNIA. MICHAEL <br /> .AND MCGEE, PLS WAS RESPONSIBLE FOR THE FINAL PROCESSING OF THE OBSERVATIONS, NETWORK <br /> S�'9L ADJUSTMENTS AND GPS SURVEY REPORT ON FILE WITH THE CITY. SAID REPORT PROVIDES <br /> _ __________ _ _ w ADDITIONAL INFORMATION ON NAVD 88 ORTHOMETRIC HEIGHTS AND GEOIDAL MODELING NOT <br /> U DARREL G.RAMUS 0 <br /> DARREL G. RAMUS, P.L.S. NO 7192 INCLUDED HEREIN. <br /> LICENSE EXPIRATION DATE: 12/31/03 EXP 12/31/03 <br /> No.7192 <br /> 's <br /> a LORI <br /> MMITTEE <br /> THIS SURVEY CONFORMS TO THE INTENT OF THE FEDERAL GEODETIC CONTROL SU 0 <br /> PROSECT ` (FGCS) SPECIFICATIONS FOR GPS RELATIVE POSITIONING (1988) AND THE CALIFORNIA <br /> COUNTY SURVEYORS STATEMENT: -,.PROJECT ,; <br /> GEODETIC CONTROL COMMITTEE (CGCG) SPECIFICATIONS FOR HIGH-PRODUCTION GPS <br /> LIMITS SURVEYING TECHNIQUES (1993). BASED ON THE ABOVE ANALYSIS THE FINAL ADJUSTMENT, <br /> THIS MAP HAS BEEN EXAMINED IN ACCORDANCE WITH SECTION 8766 OF THE OVERALL, MEETS OR EXCEEDS THE REQUIREMENTS FOR A FIRST ORDER (CLASS C-1, <br /> LANA SURVEYORS' ACT THIS _Z 9 DAY OF /S/_oY_FME� 2001, 1. 100,000) SURVEY. SEE "ACCURACY" ON PAGE 3 OF 14 FOR DETAILED DISCUSSION. <br /> dW <br /> STOCKTON <br /> 7 <br /> �' FF 0' <br /> c,Q THOMAS R. FUNN, R.C.E. 23341 <br /> INTERIM COUNTY SURVEYOR o <br /> REGISTRATION EXPIRATION DATE: 12-31-01 ° No.p eaa x, <br /> t F <br /> ;��_ 05 * BASIS OF BEARINGS AND COORDINATE SYSTEM: <br /> sT9�OFCAU���\P HORIZONTAL POSITIONS AND ELLIPSOID HEIGHTS ARE REFERENCED TO THE NORTH AMERICAN <br /> DATUM OF 1983 (NAD 83), 1991.35 EPOCH ADJUSTMENT OF THE NIGH PRECISION GEODETIC <br /> -. 983, ZONE <br /> AT P <br /> _ NETWORK HPGN CONVERTED TO THE CALIFORNIA COORDINATE SYSTEM OF 1 <br /> LATHROP (CCS83, ZONE 3) BASED ON THE 1994 COSCN AS SHOWN IN BOOK 33 OF SURVEYS AGE <br /> RECORDER'S STATEMNT: <br /> 20> SAN JOAQUIN COUNTY RECORDS (SEE SURVEY REPORT ON FILE WITH THE CITY). <br /> FILED THIS __ ____ DAY OF C_e�'''i_ ? __, 2001, AT AN F <br /> M TCA <br /> 6 <br /> A.M. IN BOOK __��__-_-----_ OF SURVEYS, AT <br /> PAGE __ -M.___> AT THE REQUEST OF THE CITY OF STOCKTON. = 30,000' <br /> pG <br /> FEE: $_-_ G______ ___ _ MAP NETWORK: <br /> --- VICINITY <br /> THIS PROJECT CONSISTS OF A GENERAL. NETWORK OF 188 POINTS IN AND AROUND THE CITY. <br /> _�:- - � : = A SUBSET OF 14 POINTS REFERRED TO AS THE HIGH ACCURACY PRIMARY NETWORK WAS <br /> GARY1REEMAN ANT%DEPUTY RECORDER ESTABLISHED FOR THE PURPOSE OF DETERMINING A PRECISE GEOID MODEL BASED ON GEOID <br /> ASSESSOR/COUNTY RECORDER/COUNTY CLER1� ,�^�-� - �/���S 99. THIS PRIMARY NETWORK PROVIDED A FRAMEWORK THAT STRENGTHENED THE 2000 <br /> SAN JOAQUIN COUNTY, CALIFORNIA GENERAL NETWORK ADJUSTMENTS AND AIDED IN THE ANALYSIS OF THE POSITIONS OF POINTS <br /> IN THE 1994 COSCN GPS SURVEYS. <br /> SHEET 1 OF 14 <br />