0
<br /> TRACT NO. 3259
<br /> SUBDIVISIONS OF SAN JOAQUIN COUNTY, CALIFORNIA
<br /> MOUNTAIN MOUSE CORPORATE CENTER
<br /> BEING ALLF
<br /> 0 LOTS 4, 5, 6 AND 7 OF TRACT
<br /> NO. 2924, FILED IN BOOK 36 OF MAPS AND PLATS AT PAGE 54,
<br /> SECTION 9,TOWNSHIP 2 SOUTH, RANGE 4 EAST, MOUNT DIABLO BASE AND MERIDIAN,
<br /> SAN JOAQUIN COUNTY, CALIFORNIA
<br /> CARLSON, BARBEE & GIBSON INC.
<br /> ENGINEERS • SURVEYORS • PLANNERS
<br /> SAN RAMON, CALIFORNIA
<br /> AUGUST 2005
<br /> NOTES:
<br /> 1. SEWER AND WATER TREATMENT PLANTS SHALL BE DEEMED OPERATIONAL PRIOR TO THE
<br /> ISSUANCE OF ANY PERMITS FOR CONSTRUCTION OF BUILDINGS.
<br /> 2. TRAFFIC IMPACT MITIGATION FEES WILL BE REQUIRED AT THE TIME OF DEVELOPMENT.
<br /> COUNTY SURVEYOR'S STATEMENT
<br /> 3. IF DEVELOPMENT IMPACT FEES FOR SEWER AND/OR STORM DRAIN FACILITIES ARE
<br /> REQUIRED, SUCH FEES SHALL. AT LEAST 30 DAYS PRIOR TO SUBMITTAL OF THE "SMALL I. THOMAS R. FLINN, HEREBY STATE THAT I HAVE EXAMINED THIS FINAL MAP OF "TRACT NO. 3259,.
<br /> LOT' TENTATIVE MAP FOR NEIGHBORHOOD F. BE ADOPTED BY THE MOUNTAIN HOUSE
<br /> COMMUNITY SERVICES DISTRICT AND BY SAN JOAQUIN COUNTY, IF APPLICABLE, IN SUBDIWSIONS OF SAN JOAQUIN COUNTY, CALIFORNIA, MOUNTAIN HOUSE CORPORATE CENTER", AND
<br /> ACCORDANCE WITH SUBDIVISION MAP ACT SECTION 66483, AND PRIOR TO APPROVAL OF SIGNATURE OMISSIONS THAT THE SUBDIVISION SHOWN HEREON IS SUBSTANTIALLY THE SAME AS IT APPEARED ON THE
<br /> THE "SMALL LOT" TENTATIVE MAP FOR NEIGHBORHOOD F, ALL OTHER REQUIRED FEES TENTATIVE MAP, AND ANY APPROVED ALTERATIONS THEREOF. I FURTHER STATE THAT THIS FINAL
<br /> SHALL BE ADOPTED. MAP COMPLIES WITH ALL THE PROVISIONS OF CHAPTER 2 OF THE CALIFORNIA SUBDIVISION MAP ACT,
<br /> 4. PRIOR TO ANY GRANT OF APPROVAL FOR A DEVELOPMENT PROJECT OR ISSUANCE OFA PURSUANT TO SECTION 66436 OF THE CALIFORNIA SUBDIVISION MAP ACT, THE SIGNATURES OF THE AS AMENDED, AND ALL APPLICABLE ORDINANCES OF SAN JOAQUIN COUNTY, APPLICABLE AT THE
<br /> TIME OF APPROVAL OF THE TENTATIVE MAP AND THAT THIS FINAL MAP IS TECHNICALLY CORRECT.
<br /> BUILDING PERMIT ON THE "DESIGNATED REMAINDER," THE REQUIREMENTS OF CHAPTER FOLLOWING PARTIES HOLDING EASEMENTS AND/OR OTHER INTERESTS HAVE BEEN OMITTED:
<br /> 9-1105 (WASTEWATER DISPOSAL) OF THE SAN JOAQUIN COUNTY DEVELOPMENT TITLE
<br /> SHALL BE MET.
<br /> /�.`�
<br /> 5. PRIOR TO ANY GRANT OF APPROVAL FOR A DEVELOPMENT PROJECT OR ISSUANCE OF A 1. PACIFIC GAS AND ELECTRIC COMPANY, 75' TRANSMISSION TOWER EASEMENT, PER 1982 O.R. 125. DATED THIS DAY OF 99PMN&OR , 2005.
<br /> BUILDING PERMIT ON THE "DESIGNATED REMAINDER," THE REQUIREMENTS OF CHAPTER
<br /> 9-1120 (WATER SYSTEMS) OF THE SAN JOAQUIN COUNTY DEVELOPMENT TITLE SHALL BE 2. MARY ROCHA, ET AL, 10' PIPELINE EASEMENT, PER 2275 O.R. 259.
<br /> aze-
<br /> MET.
<br /> THOMAS R. FLINN, R.C.E. 23341 140
<br /> 3. ARNAUDO BROTHERS, RESERVATION FOR OIL, GAS, MINERALS AND OTHER HYDROCARBON SUBSTANCES COUNTY SURVEYOR
<br /> 6. PRIOR TO ANY GRANT OF APPROVAL FOR A DEVELOPMENT PROJECT OR ISSUANCE OF A LYING BELOW A DEPTH OF 500 FEET PER INSTRUMENT NUMBER 94089630. REGISTRATION EXPIRATION DATE: DECEMBER 31, 2005 '
<br /> BUILDING PERMIT ON THE "DESIGNATED REMAINDER," THE REQUIREMENTS OF CHAPTER
<br /> 9-1135 (STORM DRAINAGE) OF THE SAN JOAQUIN COUNTY DEVELOPMENT TITLE SHALL BE
<br /> MET.
<br /> 7. ALL REQUIREMENTS SPECIFIED IN EXHIBIT D OF THE MOUNTAIN HOUSE DEVELOPMENT
<br /> AGREEMENT, THE MASTER PLAN, AND THE SPECIFIC PLAN I THAT ARE TO BE FULFILLED
<br /> PRIOR TO THE FIRST DEVELOPMENT PERMIT SHALL BE SATISFIED BEFORE ANY ADDITIONAL
<br /> SUBDIVISION OR DEVELOPMENT CAN OCCUR ON PARCELS SHOWN ON THE FINAL MAP,
<br /> UNLESS WAIVED BY THE BOARD OF SUPERVISORS. AT THE TIME THE LOTS ARE
<br /> RESUBDIVIDED, ADDITIONAL CONDITIONS MAY BE IMPOSED TO REFLECT'DEVELOPMENT
<br /> CONDITIONS, PATTERN, AND DENSITY.
<br /> 8. THE DEDICATION OF GROUNDWATER RIGHTS TO THE MOUNTAIN HOUSE COMMUNITY
<br /> RECORDER'S STATEMENT:
<br /> SERVICES DISTRICT HAS BEEN ACCEPTED PER RESOLUTION R-02-378 OF THE MOUNTAIN
<br /> HOUSE COMMUNITY SERVICES DISTRICT DATED JUNE 18, 2002. FILED THIS DAY OF , 2005, AT M. IN BOOM( _ISL OF MAPS
<br /> 9. ACCESS RIGHTS AS SHOWN WERE ASSIGNED TO THE MOUNTAIN HOUSE COMMUNITY AND PLATS, AT AT ERE EST
<br /> QU OF OLD REPUBLIC TITLE COMPANY.
<br /> SERVICES DISTRICT PER TRACT NO. 2924 FILED OCTOBER 31, 2001 IN BOOK 36 OF MAPS
<br /> AND PLATS AT PAGE 54. LLE :31
<br /> 10. ALL SUBSEQUENT DISCRETIONARY AND MINISTERIAL APPROVALS WITHIN THE BOUNDARIES
<br /> OF THIS SUBDIVISION MAP SHALL BE SUBJECT TO DESIGN CONSISTENCY REVIEW AND SHALL
<br /> BE CONSISTENT WITH THE CONDITIONS OF APPROVAL ADOPTED FOR THE TENTATIVE MAP.
<br /> ).
<br /> GARY W. F AN BY: mihm&
<br /> 11. THOSE AREAS DESIGNATED AS "LANDSCAPE EASEMENT", OR "LE", AS SHOWN ON THIS MAP, ASSESSOR-RECINtDER-COUNTY CLERK OF IT-/DEPUTY RECORDER
<br /> ARE TO
<br /> BEGRANTED BY SEPARATE INSTRUMENT. SAID EASEMENTS ARE NOT CREATED BY
<br /> SAN JOAQUIN COUNTY, CALIFORNIA
<br /> THIS MAP.
<br /> 12. MOUNTAIN HOUSE CORPORATE CENTER CONTAINS 34 LOTS. THE TOTAL AREA IS 65.72
<br /> ACRES _+.
<br /> 13. ALL FRONT CORNERS ARE TO BE REFERENCED WITH A CHISELED "+" AT THE 1.0 FOOT
<br /> OFFSET ON LOT LINE PROJECTIONS AND RADIALLY AT RETURNS UNLESS OTHERWISE NOTED,
<br /> AND A RE8AR AND CAP SHALL BE SET AT NON-FRONTAGE CORNERS AS SHOWN.
<br /> 14. THOSE AREAS DESIGNATED AS "PRIVATE ACCESS EASEMENT", OR "PAE", AS SHOWN ON
<br /> THIS MAP. ARE TO BE GRANTED BY SEPARATE INSTRUMENT. SAID EASEMENTS ARE NOT
<br /> CREATED BY THIS MAP.
<br /> 673-00 (D.D. SHEET NO. 51) REFER TO MAJOR SUBDIVISION APPUCATIONS NO. PA-02-649 SHEET 2 OF 9
<br />
|