Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> Office of the Highway Department <br /> Stockton, California <br /> Telephone HO 6-9583 Julius B. Manthey <br /> P.O. Box 1810 Road Commissioner <br /> ENCROACHMENT PERMIT <br /> To Union Oil Company of California October 24, 1956 <br /> 617 W. Seventh Street (Date) <br /> Los Angeles 17, California <br /> <br /> In compliance with your request of _____________, 19____, and subject to <br /> all the terms, conditions and restrictions written below or printed as general or special <br /> provisions on any part of this form. <br /> <br /> Permission is Hereby Granted to make one road cut each across Patterson Pass, <br /> Corrall Hollow, Corrall Hollow Extension, Jefferson, Mac Arthur, Chrisman, <br /> and Bird Roads and lay 16" steel pipe from right of way line to right of way <br /> line as shown on Union Oil Company estimates/plans for each of the respective <br /> roads . The numbers of plans submitted are 373-240-4, 373-240-2, 370-243-3, <br /> 369-245-3, 368-245-3, 368-247-2 and 368-248-2, respectively. <br /> Please read the reverse side of this sheet . <br /> It is recommended that all pipe within the County right of way be cased <br /> to a point of 14 feet from the centerline of the right of way. <br /> The County Highway Department shall be notified when work is to commence. <br /> Depth of pipe shall be such that there will be a minimum coverage of 30 <br /> inches at the bottom of the borrow at each side of the road . <br /> Backfill shall be placed and compacted in such a manner that the relative <br /> compaction throughout the entire fill within the County right of way will be <br /> not less than ninety percent (90%) as determined by the Impact or Field Method <br /> Compaction Test as specified in Section 6, Article (g) of the Standard Specifi- <br /> cations of the State of California, Department of Public Works, Division of <br /> Highways, dated January, 1949. <br /> All surfacing which is cut or damaged shall be replaced in as good or <br /> better condition than when the work permitted herein was started. Permittee <br /> shall, at his own cost and expense, maintain and/or repair the backfill and/or <br /> surfacing above mentioned for a period of 90 days after the completion of the <br /> work permitted herein. Upon demand by the County, any settlement, sagging, <br /> or cracking of surface or backfill shall be immediately repaired by the Per- <br /> mittee at the sole expense of the Permittee, at any time within the above 120 <br /> day period. <br /> The work rermitted hereunder shall be completed and ready for final inspection on <br /> or before Indefinite,19_____. <br /> Immediately following completion of construction permitted herein, Permittee shall <br /> fill out and mail notice of completion provided by Grantor. <br /> <br /> This permit is issued under Section 942, Chapter 2, Division 2, and Section 1126. <br /> Chapter 4, Division 2 and Chapter 6, Division 2 of the Streets and Highways Code, and <br /> San Joaquin County Ordinances No. 324, 545 and 548. <br /> <br /> Confidential material OFFICE OF THE HIGHWAY DEPARTMENT <br /> not to be used, copied, COUNTY OF SAN JOAQUIN <br /> or disclosed. <br /> <br /> JULIUS B. MANTHEY <br /> SPLU30075939 County Engineer and Road Commissioner <br /> Encroachment Permit <br /> No. 56-290 By: Al Fleming <br /> See page 2 <br /> Permittee's Copy 5662411