Laserfiche WebLink
MANHOLE INSTALLATION <br /> i QUICKSET <br /> 35-M MANHOLE <br /> DETAIL <br /> 6 <br /> NECK EXTENSIONS AS REQUIRED ----� t' <br /> j...r 36' <br /> NATURAL GROUND ,. <br /> 36. 6 <br /> 1 <br /> i <br /> • <br /> NOTES <br /> EXCAVATION TO BE LEVELED. <br /> .� MINIMUM EXCAVATION 6' X 8' X 5.125' <br /> DEPTH TO BE DETERMINED ON SITE. <br /> MINIMUM 6" BASE OF SMALL PEA <br /> "*�•�;�,,( <br /> GRAVEL, OR SAND COMPACTED <br /> AND LEVEL <br /> BACKFILL AND ASPHALT REPAIR TO BE <br /> DONE PER "STREET CUT AND <br /> EXCAVATION REPAIR STANDARDS". <br /> GROUND ROD: '/2" X TIN LENGTH - <br /> COPPER CLAD - STEEL CENTER TO BE <br /> INSTALLED BY CONTRACTOR. <br /> GST <br />