Laserfiche WebLink
Permit No. 02-08 <br /> April 5, 2002 <br /> SPECIAL CONDITIONS: <br /> 1. The San Joaquin County Flood Control and Water District (District) shall <br /> not be responsible for the maintenance of the facilities specified in this <br /> Permit. <br /> 2. The Permittee shall be responsible for any and all damages to Potter Creek <br /> Channel "B" resulting from this project. <br /> 3. The applicant shall be responsible for the modification or possible removal <br /> of the facilities as requested by the District, if required, for any future flood <br /> control plans at the applicant's sole cost and expense. <br /> 4. The District shall not be responsible for damage to any of the facilities due <br /> to the District's operations and maintenance of Potter Creek Channel "B." <br /> 5. The dams shall not reduce the capacity of the existing Potter Creek <br /> Channel "B." <br /> 6. All flash boards must be removed annually from the dam by November 1, <br /> and shall not be replaced before April 15. <br /> 7. The rip-rap shall be a minimum of 10 feet upstream and a minimum of <br /> 20 feet downstream of the dam. <br /> 8. No work shall be allowed within the creek banks and channel between <br /> November 1, and April 15. <br /> FC-2D026-T3 <br />