My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2002_EP-02-01 thru EP-02-50_ - EP-02-16
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2002
>
EP-02-01 thru EP-02-50
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2002_EP-02-01 thru EP-02-50_ - EP-02-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:27:06 AM
Creation date
1/23/2016 3:55:50 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-02-16
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2002\EP-02-01 thru EP-02-50
Year2
2002
Supplemental fields
APN
Applicant
City
Cross Ref
DocCategory
Permits
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PERMIT No. 02-16 <br /> December 27, 2002 <br /> SPECIAL CONDITIONS: <br /> 1. The San Joaquin County Flood Control and Water Conservation District (District) shall <br /> not be responsible for the maintenance of the facilities specified in this Permit. <br /> 2. The Permittee shall be responsible for the modification or possible removal of the <br /> facilities as requested by the District, if required for any future flood control plans at the <br /> applicant's sole cost and expense. <br /> 3. The Permittee shall be responsible for any damage to Bear Creek that may occur as a <br /> result of this project. <br /> 4. The Permittee shall keep the pipes draining into Bear Creek free of all obstructions, <br /> which prevent or retard the flow of water. <br /> 5. The Permittee shall only construct the berm within the area delineated on the enclosed <br /> site plan. <br /> 6. Work in the proposed ditch shall take place only between April 15th and November 1S` <br /> FC-2L085-E3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.