My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2002_General_ - 2002 Oct.
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2002
>
General
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2002_General_ - 2002 Oct.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:05:49 AM
Creation date
1/23/2016 3:55:40 AM
Metadata
Fields
Template:
Permits_Development
DocName
2002 Oct.
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2002\General
Year2
2002
Supplemental fields
APN
Applicant
City
Cross Ref
DocCategory
Permits
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SAN JOAQUIN COUNTY ���))pp{{,, <br /> FLOOD CONTROL & WATER Tt SAS R. IC WO <br /> DIREC dR OF PUBLIC WORKS <br /> FLOOD CONTROL ENGINEER <br /> CONSERVATION DISTRICT <br /> P.O.BOX 1810 <br /> 1810 EAST HAZELTON AVENUE <br /> STOCKTON. CALIFORNIA 95201 <br /> TELEPHONE (209) 468-3000 <br /> FAX NO. (209) 468-2999 <br /> October 14, 2002 <br /> City of Stockton <br /> 425 North EI Dorado Street <br /> Stockton, California 95202-1997 <br /> SUBJECT: MODIFICATION OF ENCROACHMENT PERMIT NO. 02-01 <br /> This letter is in response to your request to modify the plans, and for allowance of work beyond the <br /> November 1, 2002, cutoff date specified in Special Condition No. 5 of your Encroachment Permit. Your <br /> request is hereby approved providing you accomplish the work required under the General Conditions <br /> and the following Special Conditions: <br /> 1. No work shall be allowed within the channel of Weber Slough (Slough) after November 15, 2002. <br /> 2. The San Joaquin County Flood Control and Water Conservation District (District) shall not be <br /> responsible for the maintenance of the facilities specified in this Permit. <br /> 3. The Permittee shall be responsible for any and all damages to the Slough resulting from this <br /> project. <br /> 4. The applicant shall be responsible for the modification or possible removal of the facilities as <br /> requested by the District, if required for any future flood control plans at the applicant's sole cost <br /> and expense. <br /> 5. The District shall not be responsible for damage to any of the facilities due to the District's <br /> operations and maintenance of the Slough. <br /> 6. Adequate rock slope protection shall be placed at the outlet of the pipe culverts. <br /> 7. The project shall be constructed in accordance with the plans submitted with the application <br /> dated January 11, 2002. Any modification shall be submitted to and approved by the District. <br /> 8. The Slough shall be monitored for water flow daily including weekends, and in the event of water <br /> flow presence in the Slough, the dam shall be removed in order not to impede the flow of water. <br /> 9. The Slough's invert and banks shall be restored to the condition that existed prior to <br /> commencement of work. <br /> If you have further questions on this matter, please contact me at 468-3060. <br /> Sincerely, <br /> SAMEER SHARIDEH <br /> Engineer II <br /> SS:to <br /> FC-2,1052-T1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.