My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2005_DRIVEWAY_DW-05-100 thru DW-05-250_ - DW-05-180
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2005
>
DRIVEWAY
>
DW-05-100 thru DW-05-250
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2005_DRIVEWAY_DW-05-100 thru DW-05-250_ - DW-05-180
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:18:34 AM
Creation date
1/23/2016 6:05:48 AM
Metadata
Fields
Template:
Permits_Development
DocName
DW-05-180
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2005\DRIVEWAY\DW-05-100 thru DW-05-250
Year2
2005
Address
916 LAKE CANYON AVENUE
Application
CR# 025833
Supplemental fields
APN
187-440-08
Applicant
ALAN M. LEE
City
GALT
Cross Ref
DocCategory
Permits
Type (2)
DRIVEWAY ENCROACHMENT PERMIT
Zip
95632
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUNTY OF SAN JOAQUIN DW EP No: DW-05 180 NE <br /> O DEPARTMENT OF PUBLIC WORKS Date Issued: 17/25/2005 <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE Expiration Date: 12/9/2006 <br /> STOCKTON,CALIFORNIA 95201 <br /> (209)468-3000 Job No: 11005 <br /> FAX#(209)468-9324 APN No: 187 440-08 <br /> DRIVEWAY ENCROACHMENT PERMIT CR# 025833 <br /> To: ALAN M.LEE 1 Location: 3000 WAVERLY ROAD, FARMINGTON: E/S <br /> 1916 LAKE CANYON AVENUE OF WAVERLY ROAD 300'N/O HWY 4 <br /> GALT,CA95632 <br /> I <br /> RIDER <br /> In compliance with your request of 6/23/2005 Mnd subject to all the terms, conditions and <br /> restrictions written below or printed as general or special provisions on any part of this form. <br /> Permission is hereby granted to constuct ONE DRIVEWAY APPROACH shown on <br /> Permit Application No. DW-05 180 NE . <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard <br /> to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the <br /> Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> A(n) SEE STAMP ch ( SEE STAMP ') inside diameter per section 62 of the current Caltrans Standard <br /> Specifications, ALTERNATIVE PIPE AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch for <br /> drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s), from the edge of roadway <br /> pavement to right-of-way frontproperty) line shall be surfaced with a two inch (2") minimum of asphalt concrete over <br /> a IFOUR minim(j:iDpacted layer of three-quarter inch (3/4") maximum size aggregate <br /> base material (road gravel)conforming to Class 2 Aggregate Base specified in Section 26 of the current Caltrans <br /> Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and <br /> along property line. Surface grades of approach(es)and/or to open ends of pipe. No ponding nor puddles on <br /> pavement surface shall be allowed. <br /> The Field Engineering Division of this office shall receive no less than forty-eight(48) hours notice prior to <br /> beginning of any work within the County right-of-way. After completion of the work permitted herein,all <br /> debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br /> condition. The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy <br /> of the residence, but not to exceed expiration date. <br /> THOMAS R. FLINN, Director <br /> WHITE -Permittee Department of Public Works <br /> GOLDENROD -PWD Central File <br /> YELLOW -Field Inspection <br /> PINK -Permit Section <br /> By <br /> FORMS: R-17, SS/WW Perfnit section <br /> Access\Permits\Forms\Driveway E Permit Revised 07/2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.