My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_DRIVEWAY_DW-06-0001 thru DW-06-0099_ - DW-06-095
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2006
>
DRIVEWAY
>
DW-06-0001 thru DW-06-0099
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_DRIVEWAY_DW-06-0001 thru DW-06-0099_ - DW-06-095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:22:05 AM
Creation date
1/23/2016 5:06:45 AM
Metadata
Fields
Template:
Permits_Development
DocName
DW-06-095
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2006\DRIVEWAY\DW-06-0001 thru DW-06-0099
Year2
2006
Address
S/S WYMAN RD. APPROX. 200' W/O PRIEST
Supplemental fields
APN
Applicant
JEFF GANN
City
Cross Ref
DocCategory
Permits
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COUNTY OF SAN JOAQUIN DW EP No: raw-os 95isE-- <br /> C% DEPARTMENT OF PUBLIC WORKS Date Issued: 3/23/2006 <br /> Z P.O.BOX 1810-1810 E.HAZELTON AVENUE Expiration Date: 3/2/22/22 007 <br /> co -4 STOCKTON,CALIFORNIA 95201 ---- <br /> Job No: 11005 <br /> • (209)468-3000 --__ —! <br /> P FAX#(209)468-9324 APN No: 193-220-51 — <br /> CR# �36 <br /> DRIVEWAY ENCROACHMENT PERMIT -- -- <br /> NN Location: S/S WYMAN RD.APPROX.200'W/0 PRIEST <br /> To: TEFF GA <br /> 'RD. <br /> 19373 S. PRIEST RD. <br /> •FRENCH CAMP,CA.95231 <br /> In Y <br /> compliance with our request of -_ 3/16/2006 —Jnd subject to all the terms, conditions and <br /> p <br /> restrictions written below or printed as general or special provisions on any part of this form. <br /> Permission is hereby granted to constuct IONE DRIVEWAY APPROACH - - shown on <br /> Permit Application No. <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard <br /> to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the <br /> Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> A(n) SEE STAMP _itch ( EE STAMP ) inside diameter per section 62 of the current Caltrans Standard <br /> Specifications, ALTERNATIVE PIPE AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch for <br /> drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s), from the edge of roadway <br /> pavement to right-of-"(frontp�roperty) line shall be surfaced with a two inch (2") minimum of asphalt concrete over <br /> a LOUR ninim�pacted layer of three-quarter inch (3/4") maximum size aggregate <br /> base material (road gravel) conforming to Class 2 Aggregate Base specified in Section 26 of the current Caltrans <br /> Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and <br /> along property line. Surface grades of approach(es)and/or to open ends of pipe. No ponding nor puddles on <br /> pavement surface shall be allowed. <br /> The Field Engineering Division of this office shall receive no less than forty-eight(48) hours notice prior to <br /> beginning of any work within the County right-of-way. After completion of the work permitted herein, all <br /> debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br /> condition. The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy <br /> of the residence, but not to exceed expiration date. THOMAS R. FLINN, Director <br /> Department of Public Works <br /> WHITE -Permittee <br /> GOLDENROD -PWD Central File <br /> YELLOW -Field Inspection <br /> PINK -Permit Section <br /> Permit section <br /> FORMS: R-17, SS/WW' <br /> r4o pipe is required uncia► Revised 07/2000 <br /> Access\Permits\Forms\Driveway E Permit - -- -- <br /> - --- -- — - at this time. i^Ir`lvever, if in tho fi <br /> vevizq <br /> } 'S de er �� ire <br /> Ined ;j; t ,e Cou;-`y that pipe <br /> t–ju°red at this IOCation, it shall be the r <br /> )ility of the property owner A sub; =r, <br /> `pipe per Co ;nty re—j-oar f>. <br />
The URL can be used to link to this page
Your browser does not support the video tag.