Laserfiche WebLink
COUNTY OF SAN JOAQUIN DW EP No: DW-06 138NE <br /> �p u N Cp DEPARTMENT OF PUBLIC WORKS Date Issued: 5/26/2006 <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE Expiration Date: /25/2007 <br /> STOCKTON,CALIFORNIA 95201 Job No: 11005 -� <br /> (209)468-3000 APN No: 63-240-34 <br /> p FAX#(209)468-9324 <br /> � <br /> FORS DRIVEWAY ENCROACHMENT PERMIT CR# 29126 <br /> To: REG BOCKMON Location: /S HIBBARD RD.APPROX.460'S/O HARNEY <br /> LN. <br /> 8089NALL STREET <br /> ALLEY SPRINGS,CA.95252 <br /> In compliance with your request of 5/16/2006 ind subject to all the terms, conditions and <br /> restrictions written below or printed as general or special provisions on any part of this form. <br /> Permission is hereby granted to constuct <br /> NE DRIVEWAY APPROACH WITH PIPE shown On <br /> Permit Application No. DW-06 138NE . <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard <br /> to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the <br /> Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> A(n) IXTEEN ch ( 16 ') inside diameter per section 62 of the current Caltrans Standard <br /> Specifications, ALTERNATIVE PIPE AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch for <br /> drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s), from the edge of roadway <br /> pavement to right-of-wayfront property) line shall be surfaced with a two inch (7) minimum of asphalt concrete over <br /> a FOUR inim( 4�Dpacted layer of three-quarter inch (3/4") maximum size aggregate <br /> base material (road gravel)conforming to Class 2 Aggregate Base specified in Section 26 of the current Caltrans <br /> Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br /> If d cemenc shall provided g pavemente of and <br /> along property line. grades of approach(es)(es) and/or to open ends of pipeNo ponding nor puddles on <br /> pavement surface shall be allowed. <br /> The Field Engineering Division of this office shall receive no less than forty-eight(48) hours notice prior to <br /> beginning of any work within the County right-of-way. After completion of the work permitted herein,all <br /> debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br /> condition. The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy <br /> of the residence, but not to exceed expiration date. THOMAS R. FLINN, Director <br /> Department of Public Works <br /> WHITE -Permittee <br /> GOLDENROD -PWD Central File <br /> YELLOW -Field Inspection <br /> PINK -Permit Section <br /> By <br /> Permit sec ion <br /> FORMS: R-17, SS/WW <br /> Revised 07/2000 <br /> Access\Permits\Forms\Driveway E Permit <br />