Laserfiche WebLink
COUNTY OF SAN JOAQUIN DW EP No: DW-06 13 ES <br /> 2�C cOG DEPARTMENT OF PUBLIC WORKS Date Issued: /6/2006 <br /> �.► P.O. BOX 1810-1810 E.HAZELTON AVENUE <br /> { STOCKTON,CALIFORNIA 95201 Expiration Date: /5/2007 <br /> (209)468-3000 Job No: 11005 <br /> ��FaR�a�P FAX#(209)468-9324 APN No: 159-062-07 � <br /> DRIVEWAY ENCROACHMENT PERMIT CR# 29319 <br /> To: ERNESTO LARA Location: �ARROLL <br /> /S HORNER AVE APPROX. 120'W/0 <br /> �521 E.HORNER AVE. AVE. <br /> TOCKTON,CA. <br /> i <br /> In compliance with your request of 6/5/2006 nd subject to all the terms, conditions and <br /> restrictions written below or printed as general or special provisions on any part of this form. <br /> Permission is hereby granted to constuct NE DRIVEWAY APPROACH shown on <br /> Permit Application No. DW-06 139ES <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard <br /> to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the <br /> Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> A(n) EE STAMP hch ( EE STAMP ') inside diameter per section 62 of the current Caltrans Standard <br /> Specifications, ALTERNATIVE PIPE AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch for <br /> drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s), from the edge of roadway <br /> pavement to right-of-way(front_property) line shall be surfaced with a two inch (2") minimum of asphalt concrete over <br /> a FOUR inim�a�pacted layer of three-quarter inch (3/4") maximum size aggregate <br /> base material (road gravel) conforming to Class 2 Aggregate Base specified in Section 26 of the current Caltrans <br /> Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and <br /> along property line. Surface grades of approach(es)and/or to open ends of pipe. No ponding nor puddles on <br /> pavement surface shall be allowed. <br /> The Field Engineering Division of this office shall receive no less than forty-eight(48) hours notice prior to <br /> beginning of any work within the County right-of-way. After completion of the work permitted herein, all <br /> debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br /> condition. The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy <br /> of the residence, but not to exceed expiration date. <br /> THOMAS R. FLINN, Director <br /> WHITE -Permittee Department of Public Works <br /> GOLDENROD -PWD Central File <br /> YELLOW -Field Inspection <br /> PINK -Permit Section <br /> By <br /> FORMS: RAT SS/WW Permit section <br /> Access\Permits\Forms\Driveway E Permit Revised 07/2000 <br />